My WebLink
|
Help
|
About
|
Sign Out
22 ATTACHMENT 06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
041514
>
22 ATTACHMENT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 3:39:32 PM
Creation date
4/4/2014 1:29:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
22 ATTACHMENT 6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
slurry seal, overlay, or street reconstruction if deemed warranted by <br /> the City Engineer. <br /> 115. The project developer's contractor(s) shall obtain an encroachment <br /> permit from the City Engineer prior to moving any construction <br /> equipment onto the site. <br /> Urban Stormwater Runoff Requirements <br /> 116. The project developer shall install a structural control(s), such as <br /> oil/water separator(s), sand filter(s), or approved equal(s) on the site <br /> to intercept and pretreat storm water prior to reaching the storm <br /> drain. The design, locations, and a schedule for maintaining the <br /> separator shall be submitted to the City Engineer/Director of <br /> Building Inspection for review and approval prior to issuance of <br /> building permits. The structural control shall be cleaned at least <br /> twice a year: once immediately prior to October 15 and once in <br /> January. The project developer shall enter into a maintenance <br /> agreement for the oil/water separator. <br /> 117. Bulk construction materials stored outdoors that may contribute to <br /> the pollution of storm water runoff shall be covered as required by <br /> the City Engineer and/or the Director of Building Inspection. <br /> 118. The project developer shall label all on-site storm drain inlets with <br /> the wording, "No Dumping -- Drains to Bay" using City-approved <br /> methods and materials. On-site storm drain facilities shall be <br /> cleaned a minimum of twice a year as follows: immediately prior to <br /> October 15 and once in January. Additional cleaning may be <br /> required if found necessary by the City Engineer/Director of <br /> Building Inspection. <br /> 119. Prior to the commencement of any clearing, grading, or excavation, <br /> the project developer shall submit a copy of the State Water <br /> Resources Control Board Notice of Intent (NOI) for coverage under <br /> the State Construction Storm Water General Permit. <br /> 120. All cut and fill slopes shall be revegetated and stabilized after <br /> completion of grading before October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary <br /> irrigation system to ensure that the grasses are established before <br /> October 15. No grading shall occur between October 15 and April <br /> 15 unless approved erosion control/storm water quality measures are <br /> Conditions of Approval,PUD-5,Centex Homes'Apperson Ridge June 5.2001 <br /> Page 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.