My WebLink
|
Help
|
About
|
Sign Out
22 ATTACHMENT 06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
041514
>
22 ATTACHMENT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 3:39:32 PM
Creation date
4/4/2014 1:29:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
22 ATTACHMENT 6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
new measures, or change existing measures if there are other,more <br /> effective measures, which can feasibly be done. Additionally, the project <br /> developer shall work with City staff to prepare a summary report of the <br /> effectiveness of implementing the selected components, including, as <br /> feasible, the costs and benefits of each component. This report shall be <br /> prepared following construction of seventy-five percent(75%) of the <br /> project units,with actual energy use data from occupied units, if possible, <br /> which shall be forwarded to the Planning Commission for its review. <br /> 22. The project developer shall provide to the buyers of the houses <br /> covered by this approval, photovoltaic systems as an option. With <br /> the building permit plan set, the project developer shall show the <br /> installations for each of the buildings covered by this approval, to <br /> the satisfaction of the Planning Director, before issuance of a <br /> building permit. <br /> 23. The project developer shall implement the following measures with <br /> the construction of the structures covered by this approval so that the <br /> owners can install roof-mounted photovoltaic systems in the future: <br /> a. Electrical conduit and cable shall be installed from the <br /> roof/attic areas to the buildings' main electrical panels. <br /> b. Roof trusses shall be "engineered" to handle an additional <br /> load of five pounds (5 lbs.) per sq. ft. beyond that anticipated <br /> for roofing. <br /> c. An area shall be provided near the electrical panel for the <br /> "inverter" required to convert the direct current output from <br /> the photovoltaic panels to alternating current. <br /> d. A bi-directional electrical meter shall be installed. <br /> e. The roof shall be designed with built-in attachment points <br /> and/or other methods, as determined by the Planning <br /> Director, to best allow a simple retrofit of solar panels after <br /> the initial construction. <br /> These measures shall be shown on the building permit plan set <br /> submitted to the Planning Director for review and approval before <br /> issuance of the first building permit. The project developer shall <br /> provide to the future homebuyers the necessary information <br /> delineating the means by which photovoltaic panels can be applied <br /> to the roofs of the structures covered by this approval. This <br /> information shall be submitted to the Director of Planning for review <br /> and approval prior to occupancy of the first unit. <br /> Conditions of Approval,PUD-5,Centex Homes'Apperson Ridge June 5.2001 <br /> Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.