My WebLink
|
Help
|
About
|
Sign Out
22 ATTACHMENT 05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
041514
>
22 ATTACHMENT 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 3:39:19 PM
Creation date
4/4/2014 1:20:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
22 ATTACHMENT 5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grading Plan. A 20-foot wide access easement and utility easement would be created on the <br /> eastern edge of the development. This 20-foot wide easement includes a 16-foot asphalt <br /> concrete pavement serving as the private road as well as the access for emergency vehicles. <br /> The proposed road would start at an elevation of 426 feet climbing up the slope from a 3% <br /> incline to a 15% incline until it reaches the hammerhead end at an elevation of 500 feet. <br /> Retaining walls would be constructed on both sides the road. The proposed retaining wall <br /> height would vary from four to nine feet on the east side and is four feet on the west side. <br /> The existing grade at the proposed Lot 1 varies from an elevation of 450 feet at the <br /> northeastern portion of the lot to an elevation of 480 feet at the southwestern-most portion of <br /> the lot. The lot slopes up naturally southwesterly. As shown on the slope map in Exhibit B, the <br /> slope gets gentler in the southern portion of the lot than the northern portion of the lot. As <br /> such, a building envelope is proposed in the less steep portion of the lot for all structures to be <br /> constructed for Lot 1. In order to create the building pad, the grading plan shows a 2:1 cut <br /> design to remove approximately 2,400 cubic yards of dirt for a split-pad design. The building <br /> pads would be located at elevations of 460 feet and 470 feet. <br /> The proposed Lot 2 would be located to the south of the proposed Lot 1. The grade on Lot 2 <br /> varies from an elevation of 500 feet near the end of the private road to an elevation of 530 feet <br /> at the western property line. The proposed building pad would be located at an elevation of <br /> 515 feet. Due to the existing topography of the site and non-split-pad design, grading on Lot 2 <br /> would be comparably more than grading on Lot 1. <br /> Both Alternative 1 and Alternative 2 site layouts for Lot 2 would have an elevation variation of <br /> 480 feet near the end of the private road to an elevation of 530 feet at the western property <br /> line. Both alternative site layouts would need more grading as the proposed building pads <br /> would be located at an elevation of 510 feet for Alternative 1 and at 500 feet for Alternative 2. <br /> Staff believes that the proposed grading would afford a building area that is adequate in size to <br /> accommodate future buildings for both lots. However, should future homeowners request to <br /> modify the building pad elevation(s), a modification to the PUD development plan may be <br /> required as determined by the Director of Community Development. Staff has added a <br /> condition of approval to address this item. <br /> Overall, staff finds the grading plan to be acceptable. <br /> Utility Plan. The applicants submitted a preliminary utility plan for Commission's review. The <br /> preliminary utility plan shows an 18-inch storm drain would be proposed following the <br /> alignment of the private roadway. This storm drain line is sized adequately to carry the <br /> additional stormwater runoff from the future homes on both lots. Water and sanitary sewer <br /> lines would be extended from the existing City lines in Silver Oaks Court up the private road to <br /> serve the future homes. All new on-site utilities required to serve the proposed development <br /> will be installed underground in a joint utility trench. In addition, a bio-retention facility is <br /> proposed near the northern end of the private road. Two fire hydrants are proposed; one <br /> PUD-84 Planning Commission <br /> Page 14 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.