My WebLink
|
Help
|
About
|
Sign Out
22 ATTACHMENT 03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
041514
>
22 ATTACHMENT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 3:38:44 PM
Creation date
4/4/2014 1:11:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
22 ATTACHMENT 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R o <br /> . 3, \-7.-.4.4 <br /> /46 <br /> ,r.4(M;)44 <br /> :14c/ • --Zra <br /> . 4 . ,sDS s\ <br /> The property is bordered on the east and north by single family residential properties, on the <br /> west by single family residential properties and the old Pleasanton Garbage Service landfill, <br /> and the south by the Lin property with a PUD-RDR/OS (Planned Unit Development — Rural <br /> Density Residential/Open Space) land use designation. <br /> PROJECT DESCRIPTION <br /> The proposed project would be located on the northern portion of the site, in one of the Hillside <br /> Residential (HR) areas where three new home sites are allotted by the VACSP. The <br /> applicants believe that a two-lot proposal would be most suitable for the area considering its <br /> hillside setting, and as such, proposed a PUD to create two new home lots instead three new <br /> home lots. Custom homes would be constructed on both lots. The proposed project is <br /> summarized below: <br /> o Lot Sizes: Lot 1 (new) — 1.2 acres <br /> Lot 2 (new) — 1.9 acres <br /> Lot 3 (remainder/existing home lot) — 34.3 acres <br /> o Building Envelopes — Building envelopes have been created for the proposed new <br /> lots, Lot 1 and Lot 2. All structures (i.e., the main dwelling and all accessory <br /> structures, including "agricultural" accessory structures) would be required to be <br /> located within the envelopes. The building envelope for Lot 1 is approximately <br /> 21,202 square feet, and the building envelope for Lot 2 is approximately 22,725 <br /> square feet. The proposed building pads would at a minimum of 30 feet from the <br /> edge of the road and property lines. <br /> a Architectural design guidelines and site development standards have been created <br /> for the custom homes. The building pads would be created by a cut-fill pattern. A <br /> copy of the proposed design guidelines is attached as Exhibit B. <br /> Page - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.