Laserfiche WebLink
MONTHLY PROGRESS ~IMATE NO. ~ FOR PLEASANTON GAGE TP~AT~ENT PLANT <br />For the Period Ending ~ecember ~1, 19&9 Percent of Time Elapsed 82 <br />Contractor: Peter Sorensen, Redwood City, Califo Percent Completed 8~ <br /> <br />Item of Work Units Unit Total Units Payment <br />Price Price Complete Estimat~ <br />Prepare Site 1 459.91 459o91 1 A~9.91_ <br />0igester 385~2.72 <br />Excavation (cu. yds.) 1500 2.67 --AO05~O~-- __~OO __ <br />Grading I 267.00 267.00 <br />Reinforcing Steel (tons) 7 AO0.OO 2800.00 ? 2800.00 <br />Forms (sq. ft,) 9500 0.70 6650.00 - 9200 _ <br /> Concrete (cu. yds.) 290 40.O0 11600.00~ <br /> Strip and Finish 9500 0.23 2185.00 ~_~00 <br /> Prestressed Bands (tons) ll 53A.00 587A.00 .... ~ <br />Gunite (cu. yds.) 32 66.75 2136.O0 __ 32 <br />Backfill I 510.72 510.72 1 <br />Piping 1 i~F~OO1965.O~3~-Q$ 1 l~&~.OO <br />Paintin~ i 600.00 600.00 <br />?ilter ~625~50 <br />Excavation (cu. yds.) 130 ' ~' <br />Grading ! 267.00 267.00 <br /> Reinforcing Steel (tons) 5 400.OO 2000.00 ~_~_~_~ <br /> Forms (sq. ft.) 50~6 1.00 50~6.00 <br /> Concrete (cu. yds.) lk5 A0.O0 5800.00 <br /> Strip and Finish 50A6 0.23 1160.5~ <br /> Prestressed Bands (tons) A 534.00 2136.00 <br /> Mechanism i 3695.32 3~95.32 _ 1 t&95,3~ <br /> Painting i 300.00 300.00 1 5~O.00 <br /> Piping i 500.00 500.00 ~__lO__~ <br />Gunite (cu. yds.) 10 66.75 667.50 23AA <br />Underdrain (sq. ft.) 23&~ 0.32 750.00 ----3-~~_ <br />Filter Rock (tons) 326 6.00 1956.00 <br />;ludge Drying Beds 6~A4.50 <br />Grading 1 150.O0 150.OO <br />Reinforcing Steel (tons) 1-3/4 ~O0.00 700.00 .... <br />Forms (sq. ft.) 2600 0.70 1820.00 <br />Concrete (cu. yds.) 50 40.OO 2000.00 AS <br />Strip and Finish 2600 0.23 598.00 ~C~ <br />Gates and Valves 1 100.00 100.00 7/8 <br />Drain Tile (lin. ft.) 293 0.50 146.50 .... <br />Sand and Rock (tons) 380 ~.60 1~0.00 ~79 <br />,eration Basin 3287,00 <br />Excavation (cu. yds.) 600 2.67 1602.O0 <br />Forms (sq. ft.) 400 1.00 ~00.OO AGO <br />Reinforcing Steel 1 250.00 250.00 1 <br />Gunite (cu. yds.) 20 66.75 13~5.O0 20 <br />Pipe Rail 1 200.00 200.00 __1----~. <br />Mechanism 1 1500.00 1500,00 <br />iudge Sump 1035.60 <br /> Excavation (cu. yds.) 30 2.67 ~0.10 $O WO.10 <br /> Forms (sq. ft.) 350 0.70 2~5.00 <br /> Reinforcing Steel (tons) 1/A AOO.O0 100.O0 <br /> Concrete (cu. yds.) 7 AO.O0 280.00 ? 2~O.OO <br /> Strip and Finish 350 0.23 80.50 3~ ~O.~O_ <br /> Piping and Valves 1 250,00 250,00 7/$ <br /> TOTAL FOR THIS PAGE 7A2~2.78 <br /> <br />Page 1 of 3 Pages <br /> <br /> <br />