Laserfiche WebLink
~ ~ <br />tem of Work Units n t <br />Price Tota <br />Price Units <br />Com lets Payment <br />Estimat <br /> <br />TiiTf.L FROM PAGE 1 _ <br />Filter Pump Sump 07_.00 _ <br /> <br />Excavation (cu. gds.) <br />50 <br />2.67 <br />1?~.50 <br />0 _ <br />Forms (sq. ft.) 1950 0.70 1365.00 _ <br />keinforcing Steel (tons) 2 400.00 J00.00 __~ <br />Concrete (cu. gds.) <br />Strip and Finish 35 <br />1950 40.00 <br />0.23 1:,00.00 <br />lei;+?.50 <br />Piping <br />Railing <br />Pumps 1 <br />1 <br />2 1200.00 <br />150.00 <br />300.00 1200.00 <br />250.00 <br />600.00 _ gpp.pp <br />Operations Building 11250.60 <br />Pxcavation 1 75.00 i,5.~?0 <br />Forms (sq. ft.) <br />keinforcing Steei (tor,) <br />Concrete (cu. yds.) <br />~rlalls (sq, ft. ) 600 <br />1/4 <br />%;, <br />1;_00 70.00 <br />406.00 <br />40.00 <br />1.2j i+26.00 <br />100.00 <br />1006.00 <br />1.5~?0.00 <br />_ <br />___~_ <br />_ <br />~_, <br />-5L~1.~1--~ <br />Brick Facing (sq. ft.) <br />Plumbing (fixtures) 120 <br />4 1.60 <br />200.00 220.00 <br />800.00 _,___~__ _~ <br />Doors and Hardware 5 150.00 750.00 _~ <br /> <br />Roof Framing <br />Roofing Tile (sq.) <br />1 <br />li <br />550.00 <br />90.00 <br />550.00 <br />?90.00 __ <br />_ <br />__~~_ <br /> <br />Mill Work <br />1 <br />400.00 <br />300.00 _ <br />i <br />-- <br />Float Well 1 75.00 75.00 _ <br />I <br />Valves and Piping 1 1250.00 1250.00 0 <br />Sludge Pump 1 600.00 600.00 ,QO <br />Recirculation Pump 1 400.00 x,00.00 2 T~7 <br />Chemical Feeder 1 1200.00 '?_00.00 k 900,00 <br />Laboratory Equipment 1 200.00 100.00 ], , <br />Painting 1 400.00 l~OC.00 _ <br /> <br />Water Heater <br />1 <br />220.00 <br />220.00 _ <br />Water Pum 1 300.00 300.00 200.0() <br />Electrical Work 807 0°00 <br />Panel 1 1:500.00 4500.00 <br />Conduits 1 1500.00 1500.00 1 .00 <br />Wiring 2 1000.00 1000.00 <br />Fixtures _ 1 800.00 800.00 <br />Gas Equipment 1 1200.00 1200.00 ,W <br />Rebuild Clarifier 13879.50 <br />Remove Concrete (sq. St.) 158 1.00 15x.00 <br />Pipe Railing 1 175.00 175.00 <br />Curb Installation 1 55.00 55.00 <br />"vratings (sq. ft.) <br />Launders and Fittings 145 <br />1 4.50 <br />1500.00 652.50 <br />2500.00 <br />Concrete Floor (cu. yds.) 28 40.00 1120.00 <br />Refinish Top i 1000.00 1000.00 <br />Parshali Flume 1 200.00 200.00 2 100 00 <br />Bypass Structure 1 75.00 75.00 <br />Guaite (cu. yds.) 8 66.75 534.00 <br />Skimmer <br />Gates i <br />3 200.00 <br />70.00 200.00 <br />210.00 <br />Slud e Mechanisms 2 L000.00 8000.00 <br />Drirewa s ds. <br />• T362 1.' 18'8. 0 <br />Concrete Curb <br />lin. ft. 800 1.10 880.00 <br />Sidewalks S ft. 1100 0.50 550.00 <br />TOTAL OF PAGES 1 and 2 2 <br />Page 2. o£ 3 Pages <br />