Laserfiche WebLink
<br />MONTHLY PRUGRESS~TIMATE N0. ~_ FOR PLEASANTUN~~n~AGE' TP.L'ATMENT PLANT <br />Fcr the Period Ending ql October 1949 Per°cent of Time Elapsed 6~~ <br />Contractor: Peter Sorensen, Redwood City, Calif. Percent Completed 62~ <br />Item of Work Units Unit <br />Price Tota:i <br />Price Units <br />Comclete Payment <br />Estimate <br />Prepare ite 1 459.91 459.91 _ 459.Q1. <br />igester 35592.72 _ ____ <br />Excavation (cu. yds.) 1500 2.67 1,00`>.00 _1~ 4005.00 <br />Grading 1 267.00 26'",.DO 267.00 <br /> <br />Reinforcing Steel (tons) <br />7 <br />400<00 <br />2800.60 _ _ <br />. <br /> <br />Forms (sq. ft.) <br />9500 <br />0.^,C <br />6650.0') _ <br />~j510.00 <br />Concrete (cu. yds.) 290 40.00 11600.00 x+80.00 <br /> <br />Strip and Finish <br />9500 <br />C.23 <br />2155.00 _ <br />Prestressed Bands (tons) 11 534.00 55"4.00 _.__~ $44`..40-- <br />Gunite (cu. yds.) 32 b6.7> 2136.00 ____g?_ 2136sQQ_ <br />Backfill ]. 510. i2 53-0.72 QL~, <br />Piping I 1335.00 1335.0') 1 1 5.00_ <br />Painting 1 600.00 660.00 <br />Filler 2462r.~ _ <br />Excavation (cu. yds.) 1j0 2.67 347.10 1R <br />Grading 1 267.00 267.00 _1__ 2~7_n0 <br />Reinforcing Steel (tons) 5 400.00 2000.00 ____ 2000.00_ <br />Forms (sq. ft.) 5046 1.00 5046.00 <br /> <br />Cor+crete (cu. yds.) <br />145 <br />40.00 <br />5~s00.00 _ <br />_ <br />Strip and Finish 5046 0.23 1160.55 _ <br /> <br />Prestressed Bands (tons) <br />4 <br />534..00 <br />2'`.36.00 _ _ <br /> <br />Mechanism <br />1 <br />3695.32 <br />3~%95.32 _ <br /> <br />Painting <br />1 <br />300.00 <br />,~CJ.00 ._ <br />Piping 1 500.00 500.00 <br />Gunite (cu. yds.) 10 66.75 66'?,50 <br />Urderdrain (sq. ft.) 2344 0.32 750.00 <br />Filter Rock (tons) 326 6.00 1956.00 <br />Sludge Drying Beds _6R1~4.50 __ <br />Grading 1 150.00 150.00 __._-1-- Q_ <br />Reinforcing Steel (tons) <br />Fcrms (sq. ft.) 1-3/4 <br />2600 400.00 <br />C.70 "'00.00 <br />1fi20.00 ~3~ ?~.~_ <br />_-_ <br />Concrete (cu. yds.) 50 40.00 2000.00 <br />Strip and Finish 2600 0.23 595.00 <br />Gates and Yalves 1 100.00 100.00 <br />Drain Tile (lie. ft.) 793 0.50 146.50 _ <br />Sand a d o to s "80 0 <br />Aeration Basin ~2f27.OQ <br />Excavation (cu. yds.) <br />Fortes (sq. ft.) 600 <br />400 2.67 <br />I.OU 1602.00 <br />400.00 2 <br />Reinforcing Steel 1 250.00 250.00 <br />~xnite (cu. yds.) 20 bb.75 a33>.OC <br />Pipe Rail 1 200.00 200.00 <br />Mechanism 1 1500.00 1500.00 <br />Sludge Sump YO'iS.bG _ <br />':;xcavation (cu. yds.) 30 2.67 RO.1C 0 50.10 <br />Forms (sq. ft.) 350 0.70 24.5.00 _._~~ 0 00 <br />Reinforcing Steel (tons) 1/4 400.00 100.00 <br />Concrete (cu. yds.) 7 40.00 280.00 ? •~ <br />Strip and Finish 350 0.23 80.50 <br />f'ipina and Valves 1 25C.00 2 0 0 <br />TGTAL FOR THIS PAGL v <br />Page 1 of 3 Pages <br />