Laserfiche WebLink
<br />MONTHLY PROGRES~TIMATE N0. 4 FGR PLEASAidT01A~EWAGE TREATN~N'P PLANT <br />Fer the Period Ending September 30, 1949 Percent of Time Elapsed_/t8 _ <br />Contractor; Peter Sorensen, Redwood City, Calif. Percent Completed 49 <br />Item of krork Units Unit <br />Price Total <br />Price Units <br />Com lete Payment <br />Estimate <br />Prepare e 1 459.91 459.91 459.91 <br />Ligester 38592.72 <br />Excavation (cu. yds.) <br />Grading 1500 <br />1 2.67 <br />2b7.00 4005.00 <br />267.00 _._1500__ <br />_ 1 4005.00, <br />267.00_ <br />Reinforcing Steel (tons) 7 4.00.00 2800.00 2800.00 <br />Forms (sq. ft.) 9500 0.70 6650.00 9290 6 0.00_ <br />Concrete (cu. yds.) 290 40.00 11600.00 28 11 80.00 <br />Strip and Finish 9500 0.23 2185.G0 8000 18 0.00_ <br />Prestressed Bands (tons) 1T 534=OC 5874.00 10 0.00 <br />Cunite (cu. yds.) 32 bh.75 2136.00 _ <br />_ <br />_.___ <br />_ _ <br />Backfill 1 510.72 510.72 _ <br />Piping 1 1335.00 1335.00 <br /> <br />Painting <br />1 <br />600.00 <br />600.00 __ <br />Filter 24625.0_ <br />Excavation (cu. yds.) 130 2.67 34!.10 1 0 .10 <br />Grading 1 267.00 267.OG ___ 1 267.00__ <br />Reinforcing Steel (tons) <br />Forms (sq. ft.) 5 <br />5G46 1,00.00 <br />1.00 2000.00 <br />5046.00 __~ <br />$~_ 2000.00 <br />00.00_ <br />Concrete (cu. yds.) 145 40.00 5EU0.00 141 5640.00 <br />Strip and Finish 5046 0.23 11b0.58 4800 110 .00 <br />Prestressed Bands (tons) 4 534.00 x»36.00 _ <br />4_ 21 6.00 <br />Mechanism i 3695.32 395.32 _ <br />Painting 1 300.00 j:)0.00 _ <br />Piping 1 500.00 500.00 1 500.00 <br />mite (cu. yds.) 10 66.75 667.50 10 7.50 _ <br />Underdrain (sq. ft.) 2344 0.32 750.00 2344 750.00 <br />Filter Rock tons 26 6.00 1 b.00 2 195 <br />Sludge Drying Beds _6811 ._~0 <br />Grading 1 150.00 150.00 2 100,00 <br />Reinforcing Steel (tons) 13/4 400.00 700.00 ~~ 00.00... <br />Forms (sq, ft.) 2600 0.70 1820.00 _- <br />Concrete (cu. yds.) 50 40.00 2000.00 <br />Strip and Finish 2b0U 0.23 595.00 <br />Gates and Valves 1 100,00 100.00 <br />Drain Tile (lin. ft.) 293 0.50 146.50 <br /> <br />Sand d o <br />0 <br />= ' _ <br />Aeration Basin ~?8^.00 <br />Excavation (cu. yds.) 600 2.67 1602.00 600 1602.00 _ <br />Forms (sq. ft.) 400 1.00 4.00.00 00 00.00 <br />Reinforcing Steel 1 250.00 250.00 1 2 0.00 <br />Gunite (cu. yds.) 2O bb.i5 1335.00 18 1201. 0 <br />Pipe Rail 1 200.00 200.00 0.00 <br />Mechanism 1 1 00.00 1 00 00 <br />Sludge Sump <br />Excavation (cu. yds.) 30 2.67 80.10 0 80.10 <br />Forms (sq. ft.) 350 0.70 245.00 200 _ 1 0.00 _ <br />Reinforcing Steel (tons) 1/4 400.00 100.00 ___ <br />1 8 0.00 <br />Concrete (cu. yds.) 7 40.00 280.00 _ _ <br />Strip and Finish 350 0.23 80.50 _ <br />Pi in and Valves 1 2 0.00 2 0 0 <br />TOTAL FOR THIS PAGE 8.11 <br />Page 1 of 3 Pages <br />