My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
031814
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 3:14:16 PM
Creation date
3/13/2014 2:47:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/18/2014
DESTRUCT DATE
15Y
DOCUMENT NO
6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTHUR • Worked extensively with the City's electric utility,other utilities,and <br /> H E N R I Q U E S permit departments on public infrastructure project planning, <br /> reviews,approvals,and coordination with regulatory agencies. <br /> .aninr ('.nn.c,iltant <br /> • Led the division's participation and recommendations in the <br /> development of a One Stop Permit Center. <br /> • Managed planning reports,EIRs,and permit conditions for numerous <br /> high tech projects,including a major Hewlett Packard/Agilent <br /> Campus Master Plan,multiple Intel projects,Applied Materials and <br /> National Semiconductor projects, multiple Sobrato developments, and <br /> a new Kaiser hospital. <br /> • Led planning and EIR reviews for City utility projects,including <br /> development of several new substations,a demonstration fuel cell <br /> facility,Northern Electrical Receiving Station,a 4.7-mile 230-kV <br /> transmission line,and a 147-megawatt gas turbine power plant with <br /> heat recovery system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.