My WebLink
|
Help
|
About
|
Sign Out
CCMIN121713
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2010-2019
>
2013
>
CCMIN121713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2014 4:23:36 PM
Creation date
2/20/2014 4:23:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
12/17/2013
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember Brown noted that he stated a budget of $300,000 whereas the staff report reflects <br /> $405,000. <br /> Mr. Tassano clarified that the staff report indicates $300,000 for construction, as noted in his <br /> presentation, as well as an estimate of $60,000 for outside design and a $45,000 contingency. Staff <br /> feels the design work can be handled in house and the contingency is ultimately factored into the initial <br /> construction cost so staff would actually be looking for$300,000. <br /> Councilmember Brown asked if he would like to see CIP funding for the program increase from $25,000 <br /> as part of the Council's next work plan. <br /> Mr. Tassano said he always appreciates additional funding but knows the Council has many priorities to <br /> balance with a limited amount of funds. <br /> Vice-Mayor Cook-Kallio asked which of the tools listed is most effective in slowing traffic. <br /> Mr. Tassano said speed lumps, both in terms of cost and efficacy. <br /> Vice-Mayor Cook-Kallio acknowledged the significant cost to implement the program as well as the <br /> other neighborhoods that have waited several years for their own improvements. She also <br /> acknowledged the volume of children and traffic on Black Avenue and asked if it would be possible to <br /> phase the program such that some improvement can be achieved in the interim without waiting for <br /> $300,000 in funds to come available. <br /> Mr. Tassano said he was very clear in expressing his budget constraints and phasing was something <br /> the committee explored extensively. He explained that finding a good and cost effective solution to the <br /> pedestrian safety issues was one of the more challenging tasks. Pavement striping or speed lumps to <br /> slow traffic would be two of the more obvious choices. <br /> Vice-Mayor Cook-Kallio asked how much it would cost to install just the speed lumps. <br /> Mr. Tassano stated that single speed lump, contracted out as part of the standard summer overlay <br /> project, costs about $5,000. <br /> Mr. Fialho responded to Councilmember Brown's question about adjusting the annual funding <br /> allocation. He explained that this project is different than most that come forward in the program and <br /> typically traffic calming modifications don't rise to the budget estimate being presented today. <br /> Vice-Mayor Cook-Kallio asked if installing an additional stop sign at Tanglewood would help and what <br /> the cost would be. <br /> Mr. Tassano said that stop signs are inexpensive and typically cost $200 to $300, but he did not see it <br /> as effective speed control tool. He explained that when installing a stop sign for reasons other than <br /> assigning right of way, drivers perceive that the intent is to slow them down. Studies and experience <br /> show that in these circumstances drivers will often speed to these stops, stop aggressively and then <br /> accelerate quickly away. <br /> Vice-Mayer Cook-Kallio noted an area on Bernal Avenue that is striped but has no stop sign, which she <br /> stops at every time even though she knows better. She asked if striping like that would be helpful here. <br /> Councilmember Pentin referred back to the issue with mail delivery trucks and asked if the City could <br /> stipulate in the letter that Black Avenue is not the most direct path for these trucks. <br /> Mr. Tassano said they could make that request in the letter as well as when they pull vehicles over. <br /> City Council Minutes Page 4 of 20 December 17, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.