- the as-built drawings. No change. As.bus1t drawings have been submitted • ' <br /> and are pending . <br /> • '• 17.Dirt is still stodc piled on site and needs to be removed as part of the final <br /> grading: Item is completed <br /> 18.The relining wall on the left side is unfinished concrete. Finish <br /> • material,texture,and color needs to be appli�is completed. • <br /> 19.The arbor on the retaining.waII on the left side needs to be built and <br /> completed. No change. <br /> 20.The doors to the mechanical room on the lower floor of the left side need <br /> .to be installed(along with hardware)and painted. lvfechaxilcal <br /> q�'pment has not been installed. Doors are installed but doot hardware <br /> • _ - •• • s G,s71 needs to be installed. • <br /> - •21.There are black ABS pipes protruding between floors'ion the left side. ' - <br /> • These need tts be tditimed,'finished,and painted. Item is complete. • <br /> • • • . 22.The columns at the sower floor at the lower loggia are incompkte and <br /> • • need to be wished. Item is complete,see comments=appropriateness of • <br /> the whrrn'n capslais thrall: out the exterior. - • <br /> ?.3:The wall cap at the lower ; • s, at t1ve Lower loggia needs to be nom. • . <br /> _ • • . Item is • <br /> • - 24.The BBQ at the lower I is not installed. No'change. <br /> • 25.The light fixtures at the lower to need to be installed. Item is complete: <br /> • 26.The stair front-the lower loggia tower is incomplete,has an• ' <br /> • edge,and lacks a handrail. Tread lighting.. needs to be •• <br /> installed. Tread lighting is installed. Handrails and still needs to be . <br /> • <br /> . • instilled. • <br /> • .2Z The riling at the tipper loggia needs to be installed. menu is complete. - <br /> Item fete.•• Z8t Them at the tower needs to be installed. is�P <br /> j 29:The center bench.at�hupper tower needs'to be installed. Owner has • <br /> •• deleted the bench and is installing a fountain at that loaition. <br /> • 30.It is-unclear whether the stucco badcwall of the master suite on the second ' . <br /> • • • ' floor is finish coated or painted. No cluenge: Owner has indicated this is <br /> • • - • the final color, ' <br /> • 3L The columns at the rear lower. courtyard(by the family/living/guest)are <br /> • •. • ' incomplete and need to be finished. Item is complete. <br /> 32 Pterallhig aft afthe second floor roof decd off the ,mnerogm needs to be <br /> • installed.Item is comply-No speafnaations on the design have been . <br /> • submitted to the ARC far review. , - <br /> . 33.The spiral stair to the roof deck'needs to be installed. Itern is complete. <br /> • 34.The doors at the rear of the garage Sneed to be installed. Herzog metal•time . <br /> of'y` swinging were installed and being worked on at the time of <br /> inspection. Are these appropriate? No specifications on the design have been <br /> • submitted to the ARC for review. <br /> • • 35.The gazebo is incomplete. No change. • <br /> 36.The fountain and retaining wall that connects to the toW er are incomplete <br /> and unfinished. No change. <br /> 37.A second floor terrace has been added to the rear of the former unfinished <br /> .. room over the'garage. This needs to be added to the as-built plans and • <br /> submitted to the ARC, . As built drawings have been submitted and are <br /> • pending. • <br /> • <br />