My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
012114
>
SUPPLEMENTAL MATERIAL
>
SUPPLEMENTAL MATERIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:58:01 PM
Creation date
1/21/2014 2:59:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/20/2014
DESTRUCT DATE
15Y
DOCUMENT NO
SUPPLEMENTAL MATERIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page :2 <br /> Before a vibrant Tully's Plaza there was a gas station. Before the Vaughn Building, home to <br /> ground floor retail and restaurants (like Studio 7) and upstairs offices, there was Clyde Vaughn's <br /> Transmission Shop, complete with gravel parking lot and corrugated tin roof. Before Brad Hirst <br /> built the two-story building across the street now home to the Berry Patch and others, there was <br /> the Round Up Saloon. <br /> In closing, should the Council still want to adopt historic preservation policies for residential <br /> properties, we favor your making them contingent on resolution of the concerns expressed about <br /> FAR's and demolition, along with the adoption of specific policies to clarify an equal <br /> commitment to expanding retail, dining and entertainment in downtown with policies that will <br /> give property owners greater certainty and more options. <br /> Sincerely, <br /> 41111 - aio <br /> cott Raty <br /> President/CEO <br />
The URL can be used to link to this page
Your browser does not support the video tag.