Laserfiche WebLink
..or the Period Ending February 28, 1950 Percent of Time Elapsed ~04._ <br />Contractor: Peter Sorensen~ Redwood City, Calif. Percent Completed 97 <br /> <br />Item of Work Units Unit Total Units Pa~aent <br />Price Price Complete Estimate <br />Prepare Site i &59.91 &59.91 Complete <br />0igester 3_~m72 _ Complete <br />Excavation (cu. yds.) 1500 2.67 dOGS.G0 <br />Grading I 267.00 267.00 <br />Reinforcing Steel (tons) 7 &O0.O0 2800.00 <br />Fo:ms (sq. ft.) 9500 0.70 6650.00 <br />Concrete (cu. yds.) 290 &O.O0 ll600.O0 <br />Strip and Finish 9500 0.23 2125.O0 <br />Prestressed Bands (tons) 11 53A.00 587~.OO <br />~nite (cu. yds.) 32 66.75 21~6.OO <br />Backfill i 510.72 510.72 <br />Piping I 1335~00 1335.O0 <br />Painting i 600.00 600.00 <br />?ilter 2~625.50 <br />Excavation (cu. yds.) 130 2.67 3~7.10 1~O <br /> Grading i 267.00 267.00 I __~ <br /> Reinforcing Steel (tons) 5 AGO.G0 2000.00 ...... 5 <br /> Forms (sq. ft.) 5066 1.OO 50A6.O0 ~6 5OA6.O£ <br /> Concrete (cu. yds.) lA5 AO.OO 5gO0.O0 14~ ~809.00 <br /> Strip and Finish 50A6 0.23 1160.58 <br /> Prestressed Bands (tons) 4 53&.O0 2136.00 <br /> Mechanism i 3695.32 3695.32 ~ i $695.$2 <br /> Painting i 300.00 300.00 $/~ 225,00 <br /> Piping i 500.00 500.00 i $OO.OO <br /> ~unite (cu. yds.) l0 66.75 667.50 10 667.5~ <br /> Underdrain (sq. ft.) 234~ 0.32 750.00 2$AA 750.00 <br /> Filter Rock (tons) ~26 6.OO 19~6.00 $26 1956.O0 <br />~ludge Drying Beds ~8A4.50 Complete 68k&.50 <br />Grading 1 150.00 150.00 _ <br />Reinforcing Steel (tons) 1-3/4 400.00 700.00 __ <br />Forms (sq. ft'.) 2600 0.70 1820.00 <br />Concrete (cu. yds.) 50 ~O.OO 2000.00 <br />Strip and Finish 2600 0.23 598.00 <br />Gates and Valves i 100~O0 lO0.O0 <br />Drain Tile (lin. ft.) 293 0.50 !46~50 <br />Sand snd Rock (tons) ~SQ 3,50 1~O.OO <br />~eration Basin ~287,00 <br />Excavation (cu. yds.) 600 2.67 1602.00 600 1~O2.OO <br />Forms (sq. ft.) 400 1.OO 400.OO /~00 <br />Reinforcing Steel 1 250.00 250.00 1 <br />Gunite (cu. yds.) 20 66.75 13~5.00 20 1335-~ <br />Pipe Rail 1 200.00 200.00 ] <br />Mechanism 1 1500.00 1500,00 ?/R lq12.~O <br />~iudge Sump ~10%.60 ~omn]e~e <br />Excavation (cu. yds.) 30 2.67 ~O.10 <br />Forms (sq. ft.) 350 0.70 2~5.00 .... <br />Reinforcing Steel (tons) 1/d dOG.G0 1GO.GO <br />Concrete (cu. yds.) 7 &O.O0 280.00 <br />Strip and Finish 350 0.23 80.50 __ <br />Piping and Valves 1 250.00 <br />TOTAL FOR THIS PAGE 76~82.~q <br /> <br />Page 1 of 3 Pages <br /> <br /> <br />