Laserfiche WebLink
Exhibit A <br /> Tassajara Reservoir Lease Basis <br /> Original Construction Cost $ 4,112,000 <br /> Engineering (estimate) $ 411,200 <br /> Total $ 4,523,200 <br /> Amortized Capital Cost $ 261,577 <br /> Capacity MG 8 <br /> Interest rate 4% <br /> Life years 30 <br /> Annual capacity Available MG 2,920 <br /> Lease cost per MG used $89.58 <br /> Page 15 of 19 <br />