My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
110513
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2016 3:04:22 PM
Creation date
10/31/2013 11:29:00 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/5/2013
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> On April 16, 2013, Council awarded the contract to the lowest responsible bidder, <br /> Fanfa, Inc. in the amount of $220,000. The project restored the roadway profile to the <br /> design grade to provide a safe travel way for both vehicular and pedestrian traffic. The <br /> curb lane in the east bound direction on West Las Positas between Hacienda Drive and <br /> Stoneridge Drive is now re-open to vehicular traffic. Approximately 500 cubic yards of <br /> existing soil under the severely distressed area was replaced by light-weight cellular <br /> concrete material and approximately 1,200 square feet of less severely distressed area <br /> was repaired by a conventional base repair construction method. This project also <br /> included the replacement of 340 feet of existing concrete curb and gutter, 2,200 square <br /> feet of existing sidewalk, and two ADA curb ramps. This project also overlaid existing <br /> roadway surface with asphalt concrete within the project limits. <br /> DISCUSSION <br /> This project is expected to reduce the on-going roadway repairs, thereby reducing long- <br /> term operation and maintenance costs. <br /> Contract change orders totaling $7,291.82 were primarily the result of a net increase in <br /> the contract quantities and fall within the approved contingency amount of $33,000. <br /> The final project funding and expenditures are summarized in Attachment 1 to this <br /> report, indicating total project expenditure of $255,683, and an unspent balance of <br /> $35,059. Additional funds totaling $250,000 were added with the 2013-14 CIP budget <br /> to fund repairs to other sections of West Las Positas Boulevard that are experiencing <br /> settling issues. Staff is recommending the $35,059 balance be retained in the project to <br /> supplement the funds available for future West Last Positas repairs <br /> All of the work has been completed to the City's satisfaction. This project is now <br /> complete and ready for City Council acceptance. <br /> Submitted by: Fiscal Review: Approved by: <br /> Brian Dolan Emily agner Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachment: <br /> 1. Funding and Expenditure Summary <br /> Page 2 of 2 <br />