Updated 7/14/2013 <br /> EXHIBIT "D" <br /> ENGINEERING ESTIMATE <br /> SUMMARY FOR EAST PLEASANTON SPECIFIC PLAN <br /> Option 6 <br /> Description Estimate <br /> Overall Major Infrastructure <br /> El Charro Road/Stanley Boulevard Undercrossing $ 18,023,500.00 <br /> Boulder Street Improvements $ 1,958,708.04 <br /> Busch Road Improvements $ 2,343,047.32 <br /> Traffic Signals(Assumes 8 new and 3 modified) $ 2,625,000.00 <br /> Arroyo Mocho Bridges $ 3,726,000.00 <br /> El Charro Road Improvements $ 7,536,923.99 <br /> Gateways $ 300,000.00 <br /> Sewer Improvements $ 5,356,000.00 <br /> Recycled Water Lines $ 1,225,874.80 <br /> Water Improvements $ 1,530,774.00 <br /> Joint Trench Improvements $ 1,364,403.85 <br /> Total $ 45,990,232.00 <br /> 15%Contingency $ 6,898,534.80 <br /> 20%Softcosts $ 9,198,046.40 <br /> $ 62,086,813.20 <br /> Theses estimates exclude paying into recycled water exchange program to obtain required water supply.(4-6 min <br /> Kier Wright Civil Engineers Surveyors <br /> 1233 Quarry Lane, Suite 145• Pleasanton, California 94566-8475•(925)249-6555• FAX(925)249-6563 <br />