Laserfiche WebLink
Updated 7/14/2013 <br /> EXHIBIT "A" <br /> ENGINEERING ESTIMATE <br /> SUMMARY FOR EAST PLEASANTON SPECIFIC PLAN <br /> Option 1 <br /> Overall Major Infrastructure <br /> El Charro/Stanley Blvd. Undercrossing $ 18,023,500.00 <br /> Boulder Road Improvements $ 1,684,894.67 <br /> Busch Road Improvements $ 2,871,430.21 <br /> Traffic Signals(Assumes 6 new and 3 modified) $ 2,375,000.00 <br /> Arroyo Mocho Bridges $ 3,726,000.00 <br /> El Charro Road Improvements $ 7,109,948.34 <br /> Gateways $ 300,000.00 <br /> Sewer Improvements $ 5,317,000.00 <br /> Recycled Water Lines $ 1,139,051.00 <br /> Water Improvements $ 1,621,261.00 <br /> Joint Trench Improvements $ 1,365,890.50 <br /> Total $ 45,533,975.72 <br /> 15%Contingency $ 6,830,096.36 <br /> 20%Softcosts $ 9,106,795.14 <br /> $ 61,470,867.23 <br /> 'Theses estimates exclude paying into recycled water exchange program to obtain required water supply.(4-6 mil) <br /> Kier Wright Civil Engineers Surveyors <br /> 1233 Quarry Lane, Suite 145• Pleasanton, California 94566-8475•(925)249-6555•FAX(925)249-6563 <br />