My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS 02-04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
101513
>
11 ATTACHMENTS 02-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2013 4:21:34 PM
Creation date
10/9/2013 4:21:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/15/2013
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wayne Rasmussen <br /> July 25, 2013 <br /> Page 7 of 11 <br /> designated Gateway Intersection. For Gateway intersections, additional vehicle capacity <br /> could encourage more vehicle traffic that should remain on the regional transportation <br /> system and could also degrade the pedestrian experience and visual character of the <br /> intersection. The ultimate configuration of this intersection will be developed for the <br /> preferred land use and circulation Option and the EPSP Task Force will be consulted <br /> about the trade-offs between intersection capacity and level of service in the <br /> development of the final intersection configuration. <br /> Stoneridge Drive at El Charro Road: This intersection is projected to operate at LOS D <br /> or better during both peak hours considering build-out of the land uses identified in the <br /> General Plan and Housing Element. Projected peak hour service levels are not expected <br /> to change with the EPSP options under consideration. <br /> ROADWAY CAPACITY AND SIGNAL CONTROL <br /> The four Options would generate vehicle volumes on nearby roadways at levels less than what <br /> has been previously assumed for the EPSP in the HE EIR. The HE EIR evaluated both El Charro <br /> Road and Busch Road as four-lane facilities. Busch Road, based on the trip generating potential <br /> of the current Options, could be planned as a two-lane facility with consideration for additional <br /> capacity at intersections. El Charro Road is planned as four lane facility. Although not defined in <br /> any of the Options, all other roadways within the site should be two-lane roadways. <br /> New traffic signals would be needed at several locations throughout the site. It is anticipated that <br /> approximately five internal intersections would be signalized for Options 1 and 4. Option 5 would <br /> require approximately six signalized internal intersections, and Option 6 would require six or <br /> seven internal signalized intersections depending on how access to the industrial land use on the <br /> south-east area would be provided off of El Charro Road. When the preferred Option is chosen <br /> and further refined, and information is developed about how individual neighborhoods and <br /> parcels would take access to the primary roadway network, needed traffic control and intersection <br /> configurations can be better identified. All options would require approximately four existing <br /> signals to be modified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.