My WebLink
|
Help
|
About
|
Sign Out
CCMIN090313
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2010-2019
>
2013
>
CCMIN090313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2013 1:34:06 PM
Creation date
10/4/2013 1:34:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
9/3/2013
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Community Development Director Dolan presented the staff report, stating that the item includes <br /> approval of a PUD to construct 210 apartment units and 97 single-family residences on an <br /> approximately 27 acre site located next to the Gateway Shopping Center between 1-680 and Valley <br /> Avenue. A Development Agreement, which vests the project approvals for 10 years, a Growth <br /> Management Agreement, and an Affordable Housing Agreement are also before the Council for <br /> consideration. <br /> The project site is located immediately south of the Gateway Shopping Center against 1-680 and <br /> adjacent to Bernal Avenue. While the project is entirely residential in nature, its proximity to the existing <br /> retail center enables the two developments to work together as a larger mixed use project. The project <br /> consists of 3 components, each represented by different building types: higher density apartment <br /> buildings situated against but separated from the freeway by a generous landscaped setback and <br /> parking, a small lot single-family detached townhome type development, and a slightly larger single- <br /> family 2-story project. In mixing the 3 product types, the project feathers the density with the least <br /> dense development adjacent to existing single-family homes across Valley Avenue and then increasing <br /> in density and height as it moves closer to the freeway. <br /> The 210 apartment units are spread throughout 9 3-story buildings with 18-24 units in each and parking <br /> on the first floor. The 35 2-story home units sit on 50 foot by 80 foot lots, are 38 feet tall, and include a <br /> 2-car garage and driveway apron. The 62 3-story home units sit on 35 foot by 60 foot lots, go up to 45 <br /> feet in height, include a 2-car garage and an optional elevator is available to buyers. The architecture of <br /> the 3 components is traditional, with many elements pulled from the downtown. <br /> Mr. Dolan stated that as with many of the projects that have come forward recently, the apartment units <br /> are subject to the development standards and design guidelines prepared as part of the rezoning <br /> process. Also as with the others, this project has requested several exceptions, most of which are <br /> minor in nature. These include: the provision of landscape fingers in the parking area every 12 to 14 <br /> spaces rather than the standard 10 and a reduced garage door setback, which staff feels is acceptable <br /> given the overhang on the building itself. The applicant has also requested an exception to the standard <br /> which stipulates that parks situated on sites larger than 5 acres be public parks if the site is not <br /> otherwise situated in close proximity to public parks. With the recreational facilities and park located in <br /> the center of the project, and given that the project is located immediately next to a very large public <br /> park, staff feels it is appropriate for the project's central park to remain private. <br /> Mr. Dolan briefly reviewed those items which are largely in conformance with the city's standards and <br /> guidelines. A traffic analysis prepared for the project determined that the traffic generated as a result of <br /> the development is less than what would have occurred under the office project that this replaces and <br /> will meet all level of service requirements of the city. The project will pay all city and regional <br /> transportation impact fees. The project proposes to provide 785 vehicle spaces in one and two car <br /> garages, driveway aprons, and perpendicular and parallel parking spaces, which far exceeds the <br /> overall number required for the project. The project also provides parking for 367 bicycles via racks and <br /> inside garages. <br /> He presented several renderings of common open space areas. The greenbelt along 1-680 offers some <br /> setback for noise attenuation and also serves as a visual buffer when approaching the project from the <br /> south. The primary open space feature is a large recreation area in the middle of the project with the <br /> facilities that one might expect to see in a project of this caliber. The project offers extensive bicycle <br /> and pedestrian circulation options with multiple points of access running through the project to the <br /> shipping center or nearby park and a continuation of the trail constructed as part of the retail project <br /> along 1-680 that will eventually connect up to the trail system inside the park. He noted a memo on the <br /> dais reflecting that the applicant has agreed to an additional condition of approval to provide another <br /> gated access point in the middle of the project. <br /> City Council Minutes Page 3 of 12 September 3, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.