Laserfiche WebLink
trailer during construction and a printed copy shall be provided to all contractors, <br /> sub-contractors, and their employees before work begins. An encroachment <br /> permit is required from the City of Pleasanton to cross the City property. <br /> d) All construction traffic shall avoid noise-sensitive areas, including residences and <br /> outdoor recreation areas, as much as possible. Major truck trips and deliveries <br /> shall be scheduled during off peak travel times, to avoid peak travel congestion. <br /> All street surfaces on the construction routes shall be monitored by the City <br /> Engineer and the City Traffic Engineer so that any damage and debris attributable <br /> to the haul trucks is identified and corrected at the expense of the project <br /> applicant/developer. <br /> e) Prior to construction, the construction traffic route, construction hours, and contact <br /> names and telephone numbers shall be posted on the driveway entrances, <br /> throughout the construction site, and in any construction trailer(s). <br /> f) Comprehensive traffic control measures shall be implemented, including <br /> scheduling of major truck trips and deliveries, to avoid peak travel hours. If <br /> necessary, as determined by the City Traffic Engineer, proper lane closure <br /> procedures such as flagger stations, signage, cones, and other warning devices <br /> shall be implemented during construction. <br /> g) Portable toilets used during construction shall be kept as far as possible from the <br /> existing and/or the new residences as they are occupied and shall be emptied on a <br /> regular basis as necessary to prevent odor. <br /> h) Dust control best management practices, as approved by the City Engineer, shall <br /> be followed at all times during grading and construction operations. Such <br /> measures may include watering of exposed surfaces twice a day, and more <br /> frequent watering when wind speeds exceed 15 mph; covering of stockpiled earth; <br /> covering of trucks hauling dirt if windy conditions prevail. Failure to keep dust <br /> under control may result in the stoppage of all work until a modified plan <br /> acceptable to the City Engineer is approved and implemented. <br /> i) Construction trailers shall be allowed to be placed on the project site for daily <br /> administration/coordination purposes during the construction period. Shipping <br /> containers may also be placed on the construction site to store materials and <br /> equipment. <br /> j) Except for security trailers staffed by licensed security personnel, at no time shall <br /> campers, trailers, motor homes, or any other vehicle be used as living or sleeping <br /> quarters on the construction site. All such vehicles shall be removed from the site <br /> at the end of each workday. <br /> k) Emergency vehicle access route(s), water supply, and fire hydrant installations <br /> shall be provided and continuously made available as part of each phase to the <br /> satisfaction of the Fire Marshall, Livermore-Pleasanton Fire Department. <br /> Construction material storage and construction worker parking shall not obstruct <br /> the emergency vehicle access route(s). <br /> Page 6 <br />