My WebLink
|
Help
|
About
|
Sign Out
ORD 2078
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
9/26/2013 4:56:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/17/2013
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2078
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parking - Fire Lane." The signs and curbs shall be shown on the improvement plans to <br /> the satisfaction of the City Engineer and the Director of Community Development. <br /> 144. The buildings covered by this approval shall be equipped with an automatic fire sprinkler <br /> system. Plans and specifications for the automatic fire sprinkler system shall be submitted <br /> for review and approval by the Livermore-Pleasanton Fire Department prior to installation. <br /> The fire alarm system, including water flow and valve tamper, shall have shop drawings <br /> submitted for review and approval by the Livermore-Pleasanton Fire Department prior to <br /> installation. All required inspections and witnessing of tests shall be completed prior to <br /> final inspection and occupancy of the building(s). <br /> 145. Valve tamper and water flow shall be monitored by an approved supervising station in <br /> accordance with NFPA 72 and the California Fire Code. <br /> STANDARD CONDITIONS OF APPROVAL <br /> Fire <br /> 146. The apartments shall have valve tamper and water flow connected to an Underwriters <br /> Laboratory (UL) listed Central Station Service. Fire Department plan check includes <br /> specifications, monitoring certificate(s), installation certificate and alarm company UL <br /> certificate. <br /> 147. The project applicant/developer shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection. <br /> 148. Fire alarm control panel and remote annunciation shall be at location(s) approved by the <br /> Fire Prevention Bureau. All systems shall be point identified by individual device and <br /> annunciated by device type and point. <br /> 149. All fire sprinkler system water flow and control valves shall be complete and serviceable <br /> prior to final inspection. Prior to the occupancy of a building having a fire alarm system, <br /> the Fire Department shall test and witness the operation of the fire alarm system. <br /> 150. Prior to any construction framing, the project applicant/developer shall provide adequate <br /> fire protection facilities, including, but not limited to a water supply and water flow in <br /> conformance to the City's Fire Department Standards able to suppress a major fire. <br /> 151. All fire sprinkler system water flow and control valves shall be complete and serviceable <br /> prior to final inspection. Prior to the occupancy of a building having a fire alarm system, <br /> the Fire Department shall test and witness the operation of the fire alarm system. <br /> 152. The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire <br /> mains and fire hydrant locations only. Plan check comments and approvals DO NOT <br /> INCLUDE: <br /> • Installation of the on-site fire mains and fire hydrants. Specific installation drawings <br /> submitted by the licensed underground fire protection contractor shall be submitted to <br /> the Fire Prevention Bureau for approval. <br /> • Backflow prevention or connections to the public water mains. <br /> Page 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.