My WebLink
|
Help
|
About
|
Sign Out
ORD 2077
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
9/17/2013 4:46:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/3/2013
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2077
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
63. A geologic report shall be prepared as per City Municipal Code 17.12 Geologic <br /> Hazard, 18.68 PUD District, and as required by the City Engineer for site specific <br /> conditions. <br /> 64. For new streets, the minimum grade for the gutter flow line shall be set at one <br /> percent where practical, but not less than .75% unless otherwise approved by the <br /> City Engineer. <br /> Operation Services Center <br /> 65. A backflow prevention device shall be required to isolate the public water main <br /> from the private main. The backflow device shall be shown on the plans <br /> submitted to the Building and Safety Division for plan check and shall be subject <br /> to the review and approval of the City Engineer prior to issuance of a building <br /> permit. <br /> 66. The developer shall install dead-end blow off(s) to the fire hydrants per City <br /> Standards. Said details shall be shown on the plans submitted to the Building <br /> and Safety Division for plan check and permit issuance and shall be subject to <br /> the review and approval of the City Engineer and Livermore-Pleasanton Fire <br /> Marshal. <br /> Traffic Division <br /> 67. The applicant or responsible party shall pay any traffic impact fees for the <br /> development as determined by the City Traffic Engineer. This fee shall be paid <br /> prior to issuance of a building permit. <br /> 68. Comprehensive traffic control measures shall be implemented during <br /> construction, including scheduling of major truck trips and deliveries, to avoid <br /> peak travel hours. If necessary, as determined by the Traffic Engineer, proper <br /> lane closure procedures such as flagger stations, signage, cones, and other <br /> warning devices shall be implemented during construction. <br /> 69. The haul route for all materials to and from the project site shall be approved by <br /> the Deputy Director of Community Development, Transportation prior to issuance <br /> of a building permit, and shall include the provision to monitor the street surfaces <br /> used for the haul route so that any damage and debris attributable to the haul <br /> trucks is identified and corrected at the expense of the project applicant or <br /> developer. <br /> 70. An encroachment permit for work in the public right-of-way shall be approved by <br /> the City Engineer prior to the issuance of any permit by the City's Building and <br /> Safety Division or Engineering Division. Any damage to existing street <br /> improvements during construction on the subject property shall be repaired to the <br /> satisfaction of the City Engineer at the full expense of the project developer. This <br /> 13-Unit'Development Plan Ponderosa Homes <br /> PUD-97, Conditions of Approval 14 of 32 4202 Stanley Boulevard <br />
The URL can be used to link to this page
Your browser does not support the video tag.