My WebLink
|
Help
|
About
|
Sign Out
ORD 2071
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
9/17/2013 4:45:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
6/18/2013
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2071
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
submittals to the City Engineer for review and approval prior to the issuance of a <br /> grading or building permit, whichever is sooner. <br /> Construction Requirements <br /> The project shall comply with the "Construction General Permit"requirements of the <br /> NPDES Permit for construction activities (including other land disturbing activities) <br /> that disturb one acre or more (including smaller sites that are part of a larger <br /> common plan of development). Information related to the Construction General <br /> Permit is on line at <br /> http://www.waterboards.ca.gov/water issues/programs/stormwater/construction.sht <br /> ml <br /> http://www.waterboards.ca.gov/water issues/programs/stormwater/docs/finalconstp <br /> ermit.pdf <br /> 141. The Construction General Permit's requirements include, but are not limited to, the <br /> following: <br /> a. The project developer shall obtain a construction general permit (NOI) from the <br /> Regional Water Quality Control Board to discharge stormwater, and to develop <br /> and implement stormwater pollution prevention plans. <br /> b. The project developer shall submit a Stormwater Pollution Prevention Plan <br /> (SWPPP) to the City Engineer/Chief Building Official for review and approval <br /> prior to the issuance of a grading or building permit, whichever is sooner. A copy <br /> of the approved SWPPP, including all approved amendments, shall be available <br /> at the project site for City, review until all engineering and building work is <br /> complete and City permits have been finaled. A site specific SWPPP must be <br /> combined with proper and timely installation of the BMPs, thorough and frequent <br /> inspections, maintenance, and documentations. SWPPP for projects shall be <br /> kept up to date with the projects' progress. Failure to comply with the most <br /> updated construction SWPPP may result in the issuance of correction notices, <br /> citations, and/ or stop work orders. <br /> c. The project developer is responsible for implementing the following Best <br /> Management Practices (BMPs). These, as well as any other applicable <br /> measures, shall be included in the SWPPP and implemented as approved by the <br /> City. <br /> i. The project developer shall include erosion control/stormwater quality <br /> measures on the project grading plan which shall specifically address <br /> measures to prevent soil, dirt, and debris from entering the public storm <br /> drain system. Such measures may include, but are not limited to, <br /> hydroseeding, hay bales, sandbags, and siltation fences and shall be <br /> subject to the review and approval of the City Engineer/Chief Building <br /> Official. If no grading plan is required, necessary erosion <br /> control/stormwater quality measures shall be shown on the site plan <br /> submitted for a building permit, and shall be subject to the review and <br /> approval of the Building and Safety Division. The project developer is <br /> responsible for ensuring that the contractor is aware of and implements <br /> such measures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.