Laserfiche WebLink
c. No oil, gasoline, chemicals, or other harmful materials shall be deposited or <br /> disposed within the dripline of the trees or in drainage channels, swales, or areas <br /> that may lead to the dripline. <br /> d. No stockpiling/storage of fill, etc., shall take place underneath or within five <br /> feet of the dripline of the existing trees. <br /> 90.Prior to issuance of a grading or building permit, the project developer shall install a <br /> temporary six foot tall chain-link fence (or other fence type acceptable to the <br /> Director of Community Development) generally outside of the driplines of the <br /> existing trees to be saved that are located near construction. The final location of <br /> said fencing shall be subject to the review and approval of the Director of <br /> Community Development. The fencing shall remain in place until final landscape <br /> inspection by the Community Development Department. Removal of such fencing <br /> prior to that time may result in a "stop work order." <br /> Bicycle Parking <br /> 91.The public bicycle racks shall: <br /> a. Be visible and accessible. <br /> b. Support the frame of the bicycle and not just one wheel. <br /> c. Allow the frame and one wheel to be locked to the rack. <br /> d. Allow the use of either a cable or U-shaped lock. <br /> e. Be securely anchored. <br /> f. Be usable by bikes with no kickstand. <br /> g. Be usable by a wide variety of sizes and types of bicycles. <br /> Prior to the installation, the applicant/developer shall submit the design and location <br /> of the bicycle racks to the Director of Community Development for review and <br /> approval. <br /> Building and Safety Division <br /> 92.AII retaining walls higher than four feet from the top of the wall to the bottom of the <br /> footway shall be constructed of reinforced concrete, masonry, or other material as <br /> approved by the Director of Community Development, or shall be an approved crib <br /> wall type. Calculations signed by a registered civil engineer shall accompany the <br /> wall plans. <br /> 93.At the time of building permit plan submittal, the project developer shall submit a <br /> final grading and drainage plan prepared by a licensed civil engineer depicting all <br /> final grades and on-site drainage control measures to prevent stormwater runoff <br /> onto adjoining properties. <br /> 94.Prior to issuance of building permits, the applicant/developer shall submit a waste <br /> management plan to the Building and Safety Division. The plan shall include the <br /> estimated composition and quantities of waste to be generated and how the project <br /> developer intends to recycle at least 75 percent of the total job site construction <br />