My WebLink
|
Help
|
About
|
Sign Out
ORD 2071
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
9/17/2013 4:45:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
6/18/2013
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2071
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
70.The applicant shall work with the Pleasanton Unified School District (PUSD) to <br /> develop a program to offset this project's long term effect on school facility needs in <br /> Pleasanton. This program shall be designed to fund school facilities necessary to <br /> offset this project's reasonably related effect on the long-term need for expanded <br /> school facilities. The method and manner of providing these funds and/or facilities <br /> to PUSD by applicant shall be approved by PUSD and in place prior to building <br /> permit issuance. Written proof of compliance with this condition shall be provided <br /> by applicant to the City, on a form generated by PUSD, prior to building permit <br /> issuance. <br /> If required by PUSD, as part of the program developed to offset this project's long <br /> term effect on school facility needs in Pleasanton, the applicant shall pay to PUSD <br /> the school impact fees and supplemental mitigation amounts that PUSD has in <br /> place at the time the applicant files an application for a building permit for this <br /> project. <br /> 71.Prior to building permit submittal, a list of the green building measures used in the <br /> design of the units covered by this approval shall be provided to the Planning <br /> Division for the review and approval by the Director of Community Development. <br /> The green building measures shall be shown on one of the first two pages of the <br /> plans submitted for issuance of a building permit. Each point identified shall have a <br /> notation indicating the sheet the point can be found, and each sheet shall note <br /> where the point is located. All proposed green building measures shall be shown <br /> throughout the plan set, as appropriate, as determined by the Director of <br /> Community Development. <br /> A special inspection by from the Planning Division shall be coordinated with regards <br /> to landscaping, irrigation, and exterior materials. All of the green building measures <br /> indicated on the approved checklist shall be inspected and approved by either the <br /> City of Pleasanton, a third party rater, or the applicant/developer shall provide <br /> written verification by the project engineer, architect, landscape architect, or <br /> designer. <br /> 72.AII HVAC condensing units shall be shown on the plans and shall be subject to the <br /> review and approval of the Director of Community Development prior to building <br /> permit issuance. <br /> 73.Only gas fireplaces, pellet fueled wood heaters or EPA certified wood-burning <br /> appliances may be installed inside or outside of the structures. <br /> 74.AII conditions of approval shall be attached to all building permit plan check sets <br /> submitted for review and approval, whether stapled to the plans or located on a <br /> separate plan sheet. These conditions of approval shall be attached at all times to <br /> any grading and construction plans kept on the project site. It is the responsibility of <br /> the applicant/developer to ensure that the project contractor is aware of, and abides <br /> by, all conditions of approval. It is the responsibility of the applicant/developer to <br />
The URL can be used to link to this page
Your browser does not support the video tag.