My WebLink
|
Help
|
About
|
Sign Out
ORD 0866
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
0801 - 0900
>
ORD 0866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2004 12:01:30 PM
Creation date
3/24/1999 4:20:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 0866
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28. That the developer submit a site development plan in <br /> accordance with the Survey Ordinance (Article 3, <br /> Chapter 3, Title II) and that these plans be approved <br /> by the City Engineer prior to the issuance of a <br /> building permit. <br /> <br /> 29. That the site development plan include all required <br /> information to design and construct site, grading, <br /> paving and drainage. <br /> <br /> 30. That ~he paving sections for the parking and drive areas <br /> be designed on the basis of~an R-Value test and a <br /> Traffic Index to carry the anticipated traffic load. <br /> This design shall be subject to the approval of the <br /> City Engineer. The minimum paving section shall be <br /> 2" A.C. on 5" A.B. The minimum A.C. pavement slope <br /> shall be 1%. <br /> <br />31. That the developer's contractor obtain an encroachment <br /> permit from the City prior to the beginning of con- <br /> struction. <br /> <br />32. That the developer pay any and all fees that the property <br /> may be subject to. <br /> <br />33° That because of the amount of traffic which will be <br /> generated by the proposed project, the developer shall <br /> widen or pay for the widening of Tawny Avenue to the <br /> extent necessary to accommodate a minimum of two traffic <br /> lanes and one parking lane and provide adequate room <br /> for a shoulder on the north side of that street and <br /> that the final method for the widening of Tawny, accept- <br /> able to the City staff, be arrived at prior to the <br /> issuance of any building permits on any part of the <br /> subject site, either commercial or residential. <br /> <br />34. That because of the traffic which shall be generated by <br /> the development on the subject site, the developer shall <br /> pay for additional paving at the intersection of Pico <br /> Avenue and Vineyard Avenue, restriping.the intersection <br /> as necessary and making it a four-way stop. <br /> <br />35. That the private drive through the residential portion <br /> of the development be moved westward a sufficient distance <br /> to align it with Concord Street. <br /> <br />36. That the developer submit a minor subdivision application <br /> to the City and file a parcel map to effect a split of <br /> the existing parcel into a shopping center parcel and a <br /> multi-family residential parcel. <br /> <br /> -4- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.