measures shall be maintained until such time as permanent landscaping is <br />place. <br />iii. Gather all sorted construction debris on a regular basis and place them in <br />the appropriate container for recycling to be emptied at least on a weekly <br />basis. When appropriate, use tarps on the ground to collect fallen debris or <br />splatters that could contribute to storm water runoff pollution. <br />iv. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep <br />the street pavement adjoining the project site on a daily basis. Scrape <br />caked on mud and dirt from these areas before sweeping. <br />V. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br />drain inlet nearest the downstream side of the project site in order to retain <br />any debris or dirt flowing in the storm drain system. Maintain and /or <br />replace filter materials to ensure effectiveness and to prevent street <br />flooding. <br />vi. Create a contained and covered area on the site for the storage of cement, <br />paints, oils, fertilizers, pesticides, or other materials used on the site that <br />have the potential of being discharged into the storm drain system by being <br />windblown or in the event of a material spill. <br />vii. Never clean machinery, equipment, tools, brushes, or rinse containers into <br />a street, gutter, or storm drain. <br />viii. Equipment fueling area: use a designated area away from the storm <br />drainage facility; use secondary containment and spill rags when fueling; <br />discourage "topping off' of fuel tanks; place a stockpile of absorbent <br />material where it will be readily accessible; check vehicles and equipment <br />regularly for leaking oils and fuels; and, dispose rags and absorbent <br />materials promptly and properly. Use of an off -site fueling station is <br />strongly encouraged. <br />ix. Ensure that concrete /gunite supply trucks or concrete /plaster operations do <br />not discharge wash water into a street, gutter, or storm drain. <br />X. Concrete wash area: 1) locate wash out area away from storm drains and <br />open ditches; 2) construct a temporary pit large enough to store the liquid <br />and solid waste; 3) clean the pit by allowing concrete to set; 4) break up the <br />concrete; and then, 5) recycle or dispose of properly. <br />A. Equipment and vehicle maintenance area: use a designated area away <br />from the storm drainage facility; always use secondary containment and <br />keep stockpile of cleanup materials nearby; regularly inspect vehicles and <br />equipment for leaks and repair quickly or remove from them project site; <br />and train employees on spill cleanup procedures. Use of an off -site repair <br />shop is strongly encouraged. <br />Page 25 <br />