Laserfiche WebLink
the planned renovation of Stanley Boulevard will eventually eliminate parking on one side of the street <br />and further aggravate present parking conditions. In response to this particular issue, the applicant has <br />proposed the use of a small open space that staff believes can accommodate 2 parking spaces to help <br />compensate for some of the loss. The proposed homes and home sizes are the same as in Option 1, <br />although the lot specifications do differ slightly. He noted there have been some recent developments <br />regarding ownership of the parcel which may make Option 2 less viable. <br />He provided several renderings of the existing home and said there was considerable discussion at the <br />Planning Commission about whether or not it is best preserved. Acknowledging the differences in <br />community opinion regarding which homes warrant protection, the applicant commission a historic <br />study to determine whether the home met the standards for preservation and would be eligible for the <br />California Register of Historical Resources. The study concluded that it was not, largely to do with its <br />integrity. Nevertheless, it is an older building with some interesting architecture that adds to the charm <br />and character of the downtown and staff felt it worthwhile to bring forward and option which helped to <br />support the possibility that it could be retained. <br />Both Options 1 and 2 include a pedestrian connection from the rear of the development to Vervais <br />Avenue and the downtown. The Climate Action Plan calls for pedestrian circulation improvements when <br />creating new cul -de -sacs and, while this is not a cul -de -sac, staff sees it as not dissimilar and a really <br />unique opportunity to make this kind of connection. Mr. Dolan reviewed site plans and streetscapes for <br />both options. He described the project's architecture as a combination of craftsman and cottage style, <br />with varied rooflines and a rich material palate. Home sizes are modest, ranging from 2,200 to 2,600 <br />square feet, and blend nicely with many of the homes one would find in the downtown. <br />Councilmember Brown asked what the normal floor area ratio (FAR) is on a medium density <br />development of this nature. Mr. Dolan said most are developed as part of a PUD and typically range <br />between 50% and 60% FAR. He confirmed that the proposed project ranges between 38% and 71%, <br />depending on which elevation is selected for each lot, and said this is quite typical of some of the infill <br />sites in the! downtown. He noted several with a higher FAR than is proposed for the smaller lots here. <br />Mr. Dolan continued his presentation, stating that net lot sizes range from 3,700 to 5,800 square feet. <br />He noted that several larger lots which back up to the arroyo actually have far less useable space. He <br />discussed the site's existing trees, many of which suffer from unorthodox pruning and are generally of a <br />condition that is not considered worth saving and some of which fall in the path of the proposed <br />development. There are, however, several trees in the arroyo and around the perimeter of the site that <br />are in good condition and will be protected during construction. The proposed conditions of approval <br />require the standard mitigation either through payment into the urban forestry program or tree <br />replacement. He also briefly reviewed the proposal for Lot 12, which includes a unique front facing <br />architecture and wraparound porch on two sides because of its exposure to Stanley Boulevard, and the <br />offer of a dedicated easement should the proposed trail along the arroyo ever be built. <br />Key issues before the Council include selection of one of the proposed options and whether the Council <br />would like to allow a limited change in land use as described and who would be responsible for initiating <br />that process. He noted that the potential for commercial and personal services was not presented to the <br />Planning Commission, but the process to allow it is largely procedural and should go smoothly in staff's <br />opinion. Given that there is a potential buyer for Lot 13, the Council may also want to consider some <br />minor amendments to the language of Condition No. 4. As currently written, the condition requires the <br />applicant to invest $30,000 towards a new roof, exterior paint and landscaping improvements for Lot 13 <br />prior to occupancy of the project units. In order to incentivize these improvements, the applicant would <br />essentially receive a $30,000 credit on the Bernal Park fee ($2,500 per unit) that is charged on all <br />downtown projects. The sale of the lot does complicate the issue somewhat, so staff is suggesting <br />additional language which would revert back the fee to the original Bernal Park Reserve Fund if Lot 13 <br />is sold. <br />City Council Minutes Page 4 of 10 August 20, 2013 <br />