My WebLink
|
Help
|
About
|
Sign Out
ORD 2076
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
9/4/2013 1:02:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
8/20/2013
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2076
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELECTRICAL PERMIT FEE WORKSHEET <br /> ITEM UNIT PRICE <br /> Filing fee for an Electrical Permit not included with $23.50 <br /> an associated Budding Permit <br /> New Single-Family Dwelling Electrical Permit Foe $0 056 per square foot <br /> New Multi-FamiyElectrical P e_nnit Fee $0 0502 r square foot <br /> Electrical Plan Review Fee 25%of Electrical Permit fee,minimum one-hour, <br /> $98.48 <br /> Additional Plan Review(more than one irktial recheck Minimum one-hors.$98.48,or based upon review <br /> or for revisions to orev:ously approved plans) time multiplied by the current reviewer rate. plus a <br /> $20.00 adman fee <br /> Appliances $4 75 each <br /> &sways $7 25 per 100!real feet <br /> General Clouts $525 per circuit <br /> Generators(under 10 kVA; - $23.50 each <br /> Lighting Fixtures <br /> First 20 fixtures $1.10 each <br /> Fixtures exceeding 20 $0.73 each <br /> Miscelaneous Electrical Apparatus $1610 each <br /> Motors or Generators <br /> Up to 1 HP (5 1 kVA) $4.75 each <br /> Up to 10 HP (S 10 kVA) $12.30 each <br /> Up to 50 HP (5 50 kVA) $2460 each <br /> Up to 100 HP is 100 kVA/ $49.50 each <br /> Over 100 HP (> 100 kVA) $74.50 each <br /> Photo-Voltaic Systems,Residential <br /> Up to 15kW $150.00,plus one-hour plan review fee <br /> Over 15W1 $400.00,plus$15 per additional kW above 15.and <br /> one-hour plan review fee <br /> Photo-Voltaic Systems, Non-Residential <br /> Up to 50kW $250 min.$16 per kW,plus two-hour plan review fee <br /> Over 50W1 $12 per kW, plus$5 per additional kW above 50,and <br /> four-hour plan review fee <br /> Receptacles. Switches,Other Outlets <br /> First 20 outlets $1 10 each <br /> Outlets exceeding 20 $0.73 each <br /> Electrical panels <br /> Up to 199 amp (under 070 volts) $30.50 each <br /> Up to 999 amp(under 60]volts) $62.15 each <br /> 1000 amp or more (artier GOO volts) $124.30 each <br /> Panelboards over 60D v $124.30 each <br /> Signs.marouees $24.60 each <br /> Private Spa or Swimming Pool $49.50 each <br /> Temporary Power (Pole or Pedestal) $23.50 each <br /> Temporary Power Distribution{cur wnstrucaun rotes $12.30 each <br /> seasaral lots.etc per pole or X'ecestal) <br /> Transformers $66.50 each _ <br /> +Ev1.EO A4y 1 203. March 23:3.snuffy 1. 2013 hbro 1 7712.January 1. 2012 ;La 6, 2,6t1:duty 1. :011 Much I 2e II. <br /> January 1,201, Novenae]IS. 2010 August 1.201J Jury f 2210,Fab 24 =1110.Jan I.22009 UXr 30 20010:Joy 1. 200-11;Jan 1 20011. <br /> Dec.10 2001;Ian 3 200"Jan 1.200!;t3oc 1 220ti Nov 13. 2006:July 14,2005;an 2 2090 Juy 14.22005 Novi 2004:July 2 2004: <br /> May 10 2004;March S.2003 Ian 11.3034 Apra 12.2002.Mach 15 20:2 Seal 6,2031 Jan.5 2001 <br /> Page 10 0110 <br /> F ' . - . 711- <br /> Error! Unknown document property name. 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.