My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
090313
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 12:09:59 PM
Creation date
8/29/2013 12:09:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/3/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton <br /> East Amador Relief Sewer Pump Station Project <br /> Preliminary Drawing List <br /> — <br /> Sheet No. DWG No. Descri•lion _ <br /> GENERAL <br /> 1 G 1 Cover Sheet <br /> 2 G 2 Sheet Index&Design Criteria <br /> 3 G 3 General Structural and Architectural Notes <br /> 4 G 4 Staging and Access Plan <br /> TYPICAL DETAILS <br /> 5 TG 1 General-1 <br /> 6 TG 2 General-2 <br /> 7 TG 3 General-3 <br /> CIVIL <br /> 8 C1 Paving and Grading <br /> 9 C 2 Yard Piping Area <br /> 10 C 3 Piping Profile-1 <br /> 11 C 4 Piping Profile-2 <br /> 12 C 5 Piping Profile-3 <br /> 13 C 6 Piping Profile-4 <br /> 18 C 7 EATS PS-Connection to Pleasanton Junction Structure <br /> ARCHITECTURAL <br /> 19 A 1 Building Elevations <br /> 20 A 2 Door&Window Schedule&Details <br /> STRUCTURAL/MECHANICAL <br /> 21 S/M 1 Building-Ground Level Plan&Roof Plan <br /> 22 S/M 2 Building-Sections and Details <br /> 23 S/M 3 Pump Station-Bottom Plan <br /> 24 S/M 4 Pump Station-Top Plan and Section <br /> 25 S/M 5 Pump Station-Sections <br /> 26 S/M 6 Pump Station-Sections and Details <br /> ELECTRICAL <br /> 27 E 1 Electrical Symbol Legend <br /> 28 E 2 Electrical Abbreviations <br /> 29 E 3 Site Power Plan <br /> 30 E 4 Luminaire and Panelboard Schedule <br /> 31 E 5 MCC and Switchboard One Line Diagram <br /> 32 E 6 MCC and Switchboard Elevations <br /> 33 E 7 Power and Control Plan <br /> 34 E 8 Lighting and Grounding Plan <br /> INSTRUMENTATION <br /> 35 N 1 Symbols and Legend I <br /> 36 N 2 Symbols and Legend II <br /> 37 N 3 System Block Diagram <br /> 38 N 4 Typical Loop Diagrams/Control Panel Power Diagram <br /> 39 N 5 Control Schematics <br /> 40 N 6 Control Schematics <br /> 41 N 7 Pump Station Pumps 1&2 <br /> 42 N 8 Pump Station Pumps 3&4 <br /> 43 N 9 Flow Meter and Ancillary Facilities <br /> EARS PIPELINE <br /> 44 CS 1 Overall Plan <br /> 45 CS 2 Pipeline Repair Details <br /> 46 CS 3 Pipeline Repair Details <br /> 47 CS 4 Hopyard/Stoneridge Manhole and EARS/EATS Connection Manhole <br />
The URL can be used to link to this page
Your browser does not support the video tag.