My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
082013
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:31:08 PM
Creation date
8/14/2013 2:25:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2013
DESTRUCT DATE
15Y
DOCUMENT NO
17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25. The project developer shall mitigate the tree removal by planting additional trees <br /> on the lots, increase the size of the proposed trees that are presently shown on <br /> the landscape plan, and/or making a payment to the Urban Forestry Fund, <br /> subject to the satisfaction of the City Landscape Architect and Director of <br /> Community Development. The required payment shall be paid in full prior to <br /> issuance of a building permit. <br /> 26. The State of California's Green Building Standards Code, "CALGreen," as <br /> amended, shall apply, as applicable. <br /> 27. The homes covered by this approval shall comply with the current City of <br /> Pleasanton's Garbage Service's recycling and composting programs. <br /> 28. A minimum of one appliance or system that meets Energy Star standards shall be <br /> installed as part of the project. The appliance(s) shall be installed as part of the <br /> project. The appliance(s) or system(s) shall be stated on the plans submitted for <br /> issuance of a building permit. <br /> 29. All new residences shall be constructed to allow for future installation of a <br /> photovoltaic (PV) system and solar water heating systems. The project applicant <br /> shall comply with the following requirements for making all new dwelling units <br /> photovoltaic-ready and solar-water-heating-ready: <br /> a. Electrical conduit and cable pull strings shall be installed From the roof/attic <br /> area to the building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an <br /> "inverter" required to convert the direct current output from the photovoltaic <br /> panels to alternating current; <br /> c. Engineer the roof trusses to handle an additional load as determined by a <br /> structural engineer to accommodate the additional weighs of a prototypical <br /> photovoltaic system beyond that anticipated for roofing; <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. Space shall be provided for solar-hearing tank. <br /> These measures shall be shown on the building permit plan set submitted to the <br /> Director of Community Development for review and approval before issuance of <br /> the first building permit. The project developer shall provide the future <br /> homeowners the necessary information delineating the means by which <br /> photovoltaic panels can be applied to the roofs of the structures covered by this <br /> approval. This information shall be submitted to the Director of Community <br /> Development for review and approval prior to the occupancy of the first unit. <br /> 13-Unit)Development Plan Ponderosa Homes <br /> PUD-97, Conditions of Approval 7 of 32 4202 Stanley Boulevard <br />
The URL can be used to link to this page
Your browser does not support the video tag.