Laserfiche WebLink
Figure 4: Tree Survey with Proposed Tree Removal <br /> L[OtNO <br /> 0 ,Y..Y xo <br /> r^y • • \ 0 WWI Mil <br /> ise <br /> wi x ...,, <br /> PROPOSED FOR RETENTION- <br /> I '(� - <br /> - k ) <br /> I ; <br /> r �-- w <br /> n <br /> ., a , �. II <br /> :— 1._' <br /> . ... <br /> 1 <br /> Green Building: As required by the City's Green Building Ordinance., the proposed <br /> project is required to qualify for at least 50 points on BuildltGreen's GreenPoint Rated <br /> Single-Family Checklist. The applicant has proposed to incorporate green building <br /> measures into the project that allow each home to qualify for 80-90 points. Staff has <br /> included the Single-Family GreenPoint checklist in Exhibit F of Attachment 6 for the <br /> Council's review. <br /> STANLEY BOULEVARD IMPROVEMENT PROJECT <br /> As one of the Capital Improvement Projects (CIP) approved by the City Council, the <br /> Stanley Boulevard widening project is scheduled to begin in the Spring of 2016. It <br /> would include eliminating the on-street parking to allow for a bike lane, landscaping <br /> strip, and sidewalk in front of the subject property (see Figure 5 below). <br /> Fi•ure 5: Stanle Boulevard Im •rovement Proeect <br /> WORTH %WIN <br /> HT a WRY PoUn,p.WAY <br /> 1 =Xi: 4N MV• taR IMA LM[ 4 e <br /> ill <br /> b q <br /> litM IOdTR.UE 11 <br /> •• C OWA <br /> FDTFO ROW.NY IMVN\r <br /> Nn101. R� 11111 WINO <br /> ‘ele Y <br /> Page 11 of 17 <br />