Laserfiche WebLink
JA. <br /> RUGGERI JENSEN AZAR <br /> • Major Structures Stakes (ground and super structure) No Budget <br /> • Final Grade Stakes (Stage Construction) $6,041 <br /> • Miscellaneous Stakes No Budget <br /> • Fence Stakes $1,141 <br /> The general budget above totals $45,366, not to exceed without further authoriiition. Invoicing <br /> for this work will be based on our agreement with the City of Pleasanton. Scheduling for staking <br /> and deliverables for these tasks are per the Caltrans Construction Surveys manua as required. <br /> We look forward to working with you and the construction manager on this pro,iect. Please call <br /> with any questions. <br /> Sincerely, / <br /> ,b <br /> Rug eri-.Ie Azar <br /> t 1 <br /> Scott Shortlidge <br /> Survey Project Manager <br /> G.10B2012 I 2100 A DMIN PROPOSA I S 1500-1(X)1 FIII.L POI IX)CS <br />