My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
082013
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:30:17 PM
Creation date
8/14/2013 2:16:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2013
DESTRUCT DATE
15Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J o PA R 1 K H Geotechnical■ <br /> Environmental■ <br /> Materials Testing• <br /> Practicing in the Geosciences Construction Inspection• <br /> Mr. Brian Krcclic April 9, 2013 <br /> Sr. Project Manager Job No: 2010-139-CON <br /> TY LIN International <br /> 2010 Crow Canyon Place, Suite 350 <br /> San Ramon, CA 94583 <br /> Subject: Scope of Work for Geotechnical Engineering Services during construction <br /> Reference: Foothill Boulevard Improvements at Rte. 580, Pleasanton <br /> Gentlemen: <br /> We understand the above referenced project will be going into construction phase. Our office <br /> prepared the Geotechnical Report for the proposed improvements. This phase of the work will be <br /> difficult to scope out in detail at this time. The actual scope of work will depend upon the overall <br /> design,construction schedule,and effective means of construction. Following is the general scope <br /> of services that are expected during the construction phase. These are listed as a reference for <br /> contract purposes. Specific task will depend on the needs during the construction work. <br /> Provide geotechnical oversight and assistance consisting of the following: <br /> a) Respond to RFI's <br /> b) Review pile/Foundation data as requested to provide any comments <br /> c) Respond to foundation construction questions/issues <br /> d) Respond to subgrade preparation questions/issues and assist with devc loping <br /> mitigation measures (wet conditions etc.) <br /> e) Attend site meeting as requested <br /> f) Consult with Resident Engineer as needed(differing site condition issues, <br /> constructability issues etc.) <br /> The cost for these services will be based on the actual billing rates and the hours expended. If <br /> you have any questions please contact me.at your convenience... <br /> Very Truly Yours, <br /> PARIKH CONSULTANTS, INC. <br /> Gary Parikh, P.E., G.E. <br /> President <br /> Main Office: 2360 Qume Drive, San Jose,Ca 95131•(408)452-9000• FAX(408)452-9004•\vww.PARIK HNET.com <br /> San Jose • Oakland •Walnut Creek• Sacramento• Fresno <br />
The URL can be used to link to this page
Your browser does not support the video tag.