My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
082013
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:29:48 PM
Creation date
8/14/2013 2:11:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The Annual Curb and Gutter Replacement project consisted of removing and replacing <br /> 1,128 SF of damaged concrete valley gutter, 2,542 SF of sidewalk that presented <br /> potential tripping hazards, 411 LF of curb and gutter that had cracbs and drainage <br /> problems, and installing 8 new intersection ramps for ADA accessibility. The project also <br /> included improvements near Stoneridge Drive at Guzman Dr ve, and ADA <br /> improvements near the Dolores Bengtson Aquatic Center parking lot. <br /> On March 19, 2013, Pleasanton's City Council awarded the contract to the lowest <br /> responsible bidder, Nor-Cal Concrete, Inc., in the amount of $152,021. Council <br /> authorized the Director of Community Development to approve change orders up to the <br /> project contingency amount of $22,800. The project has since been completed and is <br /> ready for acceptance. <br /> Budget <br /> Funding for the project was provided in the Annual Curb and Gutter Replacement <br /> Project, CIP 125009. Change orders totaling $6,045.62 were due to an additional ramp <br /> installed at Vineyard Avenue at Adams Way, an increase in asphalt quantity at <br /> Stoneridge Drive, and credit for asphalt paving at Stoneridge Drive. The Operations <br /> Services Department requested ADA improvements at the Dolores Bengtson Aquatic <br /> Center parking lot. The cost for the parking lot work ($5,200) was paid from the <br /> Facilities Renovation fund 043900-4385. A summary of the project's funding sources <br /> and expenditures is presented in Attachment 1. <br /> A two-year extended warranty for the valley gutter at Christina Court has been <br /> negotiated due to rain conditions during the pouring of this section. <br /> Submitted by: Fiscal Review: Approve by:6tiren/ <br /> rti+Brian Dolan Emily Wagner Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Funding and Expenditure Summary <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.