Laserfiche WebLink
ELECTRICAL PERMIT FEE WORKSHEET <br /> ITEM UNIT PRICE <br /> Piing fee for an Electrical Permit not included with $23.50 <br /> an associated Budding Permit <br /> New Single-Famihy Dwelling Electrical Perini Fee $0.056 per square foot <br /> _New Multi-Femur EkOtrical Periled Fee_----_--- .$0,050_m_square fool -.--_-.-------._. _ <br /> Elect$cal Plan Review Fee i5%of Electrical Permit fee,mnimum one-hour, <br /> $98.48 <br /> Additional Plan Review more than one initial recheck Minimum one-horn,$98.48,or based upon review <br /> or for revisions to previously approved plans) time multiplied by the current re viewer rate,plus a <br /> $20.00 admin fee <br /> Appliances $4 75 each <br /> Busways $7.25 per 100 real feet <br /> General CifaJ*s $525 per circuit <br /> Generators(alder 10 kVA) $23.50 each <br /> Lighting Fcrtures <br /> First 20 fbrtises $1 10 each <br /> Fixtures exceeding 20 $0.73 each <br /> Miscelamous Electrical Apparatus $1620 each <br /> Motors or Generators <br /> Up to 1 HP (5 1 kVA) $4.75 each <br /> Up to 10 HP (5 10 kVA) $12.30 each <br /> Up to 50 HP (5 50 kVA) $24.60 each <br /> Up to 100 HP (5 100 kVA) $49.50 each <br /> Over 100 HP (> 100 kVA) $74.50 each <br /> Photo-Voltaic Systems,Residential <br /> Up to 15104 $150.00,plus one-hour plan review fee <br /> Over 15kW $400.00,plus$15 per addilions l kW above 15.and <br /> one-hour plan review fee <br /> Photo-Voltaic Systems,Non-Residential <br /> Up to 50kW $250 min,$16 per WI,plus two-hour plan review fee <br /> Over 501&V $12 per kW, plus$5 per additional kW above 50,and <br /> bur-hour plan review fee <br /> Receptacles.Switches,Other Outlets <br /> First 20 outlets $1.10 each <br /> Outlets exceeding 20 $0.73 each <br /> Eledrkal panels <br /> Up to 199 amp (under Goo volts) $30.50 each <br /> Up to 999 amp(under GOO volts) $62.15 each <br /> 1000 amp or more (under GOO vote) $124.30 each <br /> Panelboards over 800 v $124.30 each <br /> Signs.marquees $24.60 each <br /> Private Spa or Swimming Pool $49.50 each <br /> Temporary Power(Pole or Pedestal) $23.50 each <br /> Temporary Power Distribution dor construction sites $12.30 each <br /> seasonal lots. etc. per pole or pedestal) <br /> Transformers $66.50 each <br /> REVISED Ju+J 1 2013, March / 2073.Jewry 1 2013 Merin 1 2712.January 1.201= 00 e. 2011;any 1 2011 Mull' 1 2011. <br /> January I, 9011 Nonr.Oer 15. 2010.Augut 1. 2010 Any 1 2010 rat 24.2010:an 42004 Oct 30.2200 July 1,ROM;an 1.NOt, <br /> Dec. 10 2007 Jan 3 2027.Joni.200?;Dec I,2006.Nov 13 2006:July 14,2006;Jan 3 2006 Joy 14.2005 Nor 7.2004;July 2 2004: <br /> lib 0.2404;Much 3.2003 an 31,3034 April 12 20102.1.4rd,15 2002 Seal 9,2001 at 5 2001 <br /> Page 10 of 10 <br /> . - 11- <br />