Laserfiche WebLink
fwoe&ous Surface Dralnaae Fee(3"party too cellaofed to the Alameda County Flood COntror&wafer <br /> Conservation District, Zone 7) <br /> Zone 7 Drainage District fees are collected for all newly constructed impervows area. and are <br /> based on the total square footage increase of all impervious surfaces on the lot or site. <br /> Drainage Fees are only payable at time of permit issuance, and are based upon the rate in <br /> effect at the time of payment, not application date. <br /> Note: linpervious is def ned by the Zone 7 Drainage District as gay area occupied by Wading*or <br /> strucnaea, driveways, streets, sidewalks, pinking, storage or any other area where surfacing is <br /> required, and any other surface including, but not limited to, asphaN, concrete. compacted gravel or <br /> other nor-porous or semi-porous substance or substances which wag cause, assist or in any way <br /> contribute to the runoff in any appreciable amount or quanty of water or any associated liquid <br /> elements. <br /> $1.00 per sq ft of impervious surface (effective 01U401/1i) <br /> in-Lieu Park Dedication Fee(ccolliected 3t 4rwal mad t)t tx ti rosncennol devoid,fonts on by off 6107103) <br /> Single-Family Residential 39,707 per dwelling <br /> Multi-Family Residential $7.969 per unit <br /> G.I.S MaDDln4 Fee $0.002 per sq.ft., per site <br /> School Impact Fee <br /> This fee is not collected by the City of Pleasanton, but is paid by the applicant directly to the <br /> Pleasanton Unified School District (PUSD) for all new construction or additions exceeding 499 <br /> square feet in area As required by State law,school impact fees must be paid prior to issuance <br /> of the building permit <br /> Applicants must first schedule an appointment with the School District, then pick up a copy of <br /> the approved plans from our office and bring them to the School District office for a review to <br /> determine the school impact fees. A copy of the school district receipt must oe returned to the <br /> building division. <br /> Pleasanton Unified School District. To schedule an appointment, and for current school <br /> impact fee rates on buildings constructed within the City of Pleasanton, please call PUSD at <br /> (925)462-5500 <br /> Other Development Fees(appkabkr only et specific to atrcrrs ai ten-pac/ectS): <br /> South Livermore Agricultural Land Trust Fee $4.011sf($16,046.61 min.) <br /> (t party fee collected fa Tr; Valley Consery airy. rare ene_tae 3,01./12) <br /> Livermore Traffic Impact Fee $7,655/unit <br /> if parry fee collected fa City of Livermore m Ruby Hill rate effective f 40 f!1 TI <br /> Livermore Sewer Connection Fee $4,633.70)unit <br /> (3i4 parry fee en.teu d the OSRSD Sewer Cc niectm Fee N Ropy Hrli.rate effective :Mitt 7) <br /> Downtown Revitalization District Parking fin Lieu Fee $17,727.781 parking space <br /> (When oevetopment*Sin Distrct;:swat meet the onste(Stang reouvernents. rate.efeotrve 4497/1,)) <br /> Vineyard Ave Corridor Specific Plan $40,846;68,:5181 unit <br /> (34 party fee Collected for art Vatey Constevarcy at Sub-LAwsion Map necadalton. ra a se 221,06) <br /> North Sycamore Area Development Impact Fee $8,912432945.281 lot <br /> (Proportional'shared cost*,calected poor to Final t'a buteng permit,expires 34452014) <br /> Page 6 of 10 <br />