My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
082013
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:29:22 PM
Creation date
8/14/2013 2:05:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2013
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The project developer shall include erosion control/stormwater <br /> quality measures on the project grading plan which shall specifically <br /> address measures to prevent soil, dirt, and debris from entering the <br /> public storm drain system. Such measures may inc ude, but are not <br /> limited to, hydroseeding, hay bales, sandbags, ancl siltation fences <br /> and shall be subject to the review and approval of the City <br /> Engineer/Chief Building Official. If no grading plan is required, <br /> necessary erosion control/stormwater quality measures shall be <br /> shown on the site plan submitted for a building permit, and shall be <br /> subject to the review and approval of the Building and Safety <br /> Division. The project developer is responsible for ensuring that the <br /> contractor is aware of and implements such measuies. <br /> ii. All cut and fill slopes shall be revegetated and stabilized after <br /> completion of grading, but in no case later than October 15. <br /> Hydroseeding shall be accomplished before September 15 and <br /> irrigated with a temporary irrigation system to ensure that the <br /> vegetated areas are established before October 15. No grading <br /> shall occur between October 15 and April 15 Lnless approved <br /> erosion control/stormwater quality measures are in place, subject to <br /> the approval of City Engineer/Chief Building Official. Such <br /> measures shall be maintained until such time as permanent <br /> landscaping is place. <br /> iii. Gather all sorted construction debris on a regular basis and place <br /> them in the appropriate container for recycling to be emptied at <br /> least on a weekly basis. When appropriate, use tarps on the ground <br /> to collect fallen debris or splatters that could contribute to <br /> stormwater runoff pollution. <br /> iv. Remove all dirt, gravel, rubbish, refuse, and green waste from the <br /> street pavement and storm drains adjoining the site. Limit <br /> construction access routes onto the site and place gravel on them. <br /> Do not drive vehicles and equipment off paved or graveled areas <br /> during wet weather. Broom sweep the street pavement adjoining <br /> the project site on a daily basis. Scrape caked on mud and dirt from <br /> these areas before sweeping. <br /> v. Install filter materials (such as sandbags, filter fabric, etc.) at the <br /> storm drain inlet nearest the downstream side of the project site in <br /> order to retain any debris or dirt flowing in the storm drain system. <br /> Maintain and/or replace filter materials to ensure effectiveness and <br /> to prevent street flooding. <br /> vi. Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used <br /> PUD-87, Auf der Maur/ Rickenbach /Vintage City Council <br /> Page 37 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.