Laserfiche WebLink
KOTTINGER PLACE BUDGET FOOTNOTES <br /> FY 2013/2014 Budget <br /> Operating and Maintenance Expenses: <br /> 6415 Carpet Cleaning Contract: <br /> Cleaning of resident carpets on a rotational basis, as well as common area carpets. <br /> 6515 Custodial Supplies: <br /> Representing year-to-date figures annualized with a 3% increase. <br /> 6520 Exterminating Contract: <br /> Regular pest extermination and termite control and eradication. <br /> 6525 Garbage/Trash Removal: <br /> Based on current costs. Does not include a rate increase. <br /> 6524 Security Supplies: <br /> Includes locks, keys,etc. Projected budget is derived from YTD expenses annualized. <br /> 6530 Security Contract: <br /> Includes lock and door repair, etc. Projected budget for this line item is derived from YTD :xpenses annualized. <br /> 6536 Grounds Supplies: <br /> Based on YTD expenses annualized plus 3%. The expenses include occasional material used by onsite staff. <br /> 6537 Grounds Contract: <br /> Based on YTD amounts annualized plus a 2% increase. <br /> 6540 Repair Payroll: <br /> Cost for 1 FTE Maintenance tech with a 2% increase over the previous fiscal year. <br /> 6541 Repair Supplies: <br /> YTD expenses annualized with a 3% increase due to increased cost of materials. <br /> 6542 Repair Contract: <br /> YTD expenses annualized with a 2% increase. <br /> 6543 Electrical Supplies: <br /> YTD expenses annualized with a 3% increase due to increased cost of materials. <br /> 6544 Electrical Contract: <br /> Based on the possibility of having to make additional repairs to the pull cord safety system <br /> 6546 Heating Cooling Supplies: <br /> Based on TYD expenses annualized with a 3% increase. <br /> 6547 Heating Cooling Contract: <br /> No expenses in this line item for the current year. However,this anticipates the potential for a vendor to repair an air <br /> conditioner or wall heater. <br /> 6548 Appliance Repair Supplies: <br /> YTD annualized with a 3% increase. <br /> 6554 Plumbing Supplies: <br /> YTD annualized with a 3%increase. <br /> 6555 Plumbing Contract: <br /> Based on 2011/2012 expenses with a 4%increase. The high amount for YTD includes special work to install pans <br /> under all water heaters which will not be required in 2013/14. <br /> 6560 Decorating Supplies: <br /> Based on YTD expenses annualized with a 3% increase. <br /> 6591 Cable Service: <br /> Based on 2012-2013 YTD expenses annualized with a 5%increase <br /> Taxes and Insurance <br /> 6711 Payroll Taxes: <br /> Based on a rate of$14.45%for the first$7,000 for each employee, and a rate of 7.65%th:reafter. <br /> 6722 Worker's Compensation Insurance: <br /> The current rate for Workers Compensation for Kottinger is$8.73 per$100 of payroll. Includes a 10% increase as a <br /> safeguard against a potential increase from the insurance provider. <br /> 6723 Health Insurance/Benefits: <br /> Based on the employer portion of insurance for employees who work more than 30 hours per week. Current rates for <br /> this are$496 per employee per month. <br /> Elderly&Congregate Services Expenses <br /> 6983 Service Coordinator: <br /> The service coordinator works approximately 22 hours per month. <br />