My WebLink
|
Help
|
About
|
Sign Out
CCMIN060413
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2010-2019
>
2013
>
CCMIN060413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2013 4:14:19 PM
Creation date
7/22/2013 4:14:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
6/4/2013
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Wagner stated that staff would return to the Council on June 1891 for adoption of the Two Year <br /> Budget and offered to answer any questions. <br /> Mr. Fialho introduced the Four Year Capital Improvement Program, which includes two transfers <br /> totaling $2.3 million from the General Fund. <br /> Mr. Bocian presented the CIP, explaining that the CIP budget deals primarily with one time capital <br /> costs. The four year plan covers 63 projects totaling approximately $39.1 million. He provided an <br /> overview of the CIP Fund, which opens the year with a balance of $27.5 million, comprised of monies <br /> from Water and Sewer, Streets, Parks and Miscellaneous funds. The fund is projected to carry an <br /> ending balance of $24 million, most of which is reserved and allocated for specific: uses in the future. In <br /> addition to the General Fund transfers noted by Mr. Fialho, funding sources include a range of grants, <br /> ongoing Development Impact Fees, Utility Fund transfers and ongoing Streets revenues. He presented <br /> several slides showing a breakdown of fees, the relationship between financial resources and actual <br /> expenditures year to year, and a CIP comparison including the preceding and next 2 years. He showed <br /> additional slides depicting projected expenditures across the 5 programs of the CI P. <br /> Mr. Bocian explained how the adopted Council priorities are used to determine wF ich projects to fund in <br /> each program cycle. He called specific attention to the Pioneer Cemetery Project which does not have <br /> funds allocated in this CIP but staff does expect to return to the Council in the fall with a <br /> recommendation for moving through the master plan process. He also noted that the City is in the <br /> middle of a master plan for the Lion Wayside Park project, which staff expects tc complete by the end <br /> of the calendar year so that they can begin to work on prioritizing the project. <br /> Other notable projects include Phase 3 of the 1-580 at Foothill improvements, which is preparing to <br /> move forward towards actual construction, Phase 1 of the Old Vineyard Trail, and Bernal Park Phase 2. <br /> The estimated cost of the latter is $16.5 million, $14.3 of which is funded. Staff anticipates all drawings <br /> to be complete and ready to present to the Council in the late winter of early sp-ing. Funding sources <br /> include $10.6 million in City funds and $3.1 million from East Bay Regional Parks Measure WW <br /> revenues. General Fund contributions to the project include excess revenue from previously completed <br /> projects as well as $378,000 from the Happy Valley Bypass Road Reserve. The reserve balance of <br /> about $800,000 will remain with the bypass road project and a determination regarding its use will be <br /> made at a later date. Staff is also recommending that the Council authorize the transfer of $839,000 in <br /> In-Lieu Park Dedication fees left over from smaller projects. Staff is continuing to work with local sports <br /> group to close the funding gap and is confident they will have identified additional funds by the time a <br /> contract is ready to be awarded. <br /> Councilmember Brown asked and Mr. Fialho confirmed that the transfer from the bypass road reserve <br /> consists of General Fund monies, not developer funds, and that developer funds will remain available <br /> should the bypass road ever be built. Mr. Fialho clarified that the funds were collected for development <br /> related purposes for some kind of transportation related activity in the area and cc uld be reprogrammed <br /> for another related use. <br /> Mayor Thorne opened the item for public comment. <br /> Mike Hosterman, PDA President, said the PDA board has identified improvements to Lions Wayside <br /> and Delucchi Park as one of its top 4 priorities in each of the last 3 years. The I'DA believes strongly <br /> that these valuable community assets are in need of updates in order to better serve residents and <br /> visitors to the downtown. The Parks and Recreation Commission reviewed the Parks Master Plan last <br /> Thursday and voted unanimously to support version A, which includes removal of the large granite <br /> blocks currently located in the ditch, filling the ditch, repositioning the bandstand to a location near the <br /> current icehouse, and installing removable bollards. The PDA is excited to see these parks improved <br /> because they serve as a gateway to the downtown, enhance the beautiful Firehouse Arts Center, and <br /> will increase the overall usability of that space. The PDA is eager to participate in the renovation <br /> City Council Minutes Page 13 of 16 June 4, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.