Laserfiche WebLink
a. Electrical conduit and cable pull strings shall be installed from the roof/attic <br /> area to the building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an <br /> "inverter" required to convert the direct current output from the photovoltaic <br /> panels to alternating current; <br /> c. Engineer the roof trusses to handle an additional load as determined by a <br /> structural engineer to accommodate the additional weight of a prototypical <br /> photovoltaic system beyond that anticipated for roofing. <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. Space shall be provided for solar-heating tank. <br /> These measures shall be shown on the building permit plan set submitted to the <br /> Director of Community Development for review and approval before issuance of the <br /> first building permit. <br /> 8. Except as shown in the PUD development plan, the lots and structures covered by <br /> this PUD approval shall be subject to the following site development standards: <br /> Roselyn Estates 11 (PUD-94) <br /> (in feet) <br /> Front Setback <br /> Living Area/House 20 <br /> Covered Porch 15 <br /> Garage (Front Facing 20 <br /> Garage (Side Entry) 15 <br /> Rear Yard Setback <br /> Living Area 20 <br /> Covered Porches 15 <br /> Side Yard Setback 10 min. on each side <br /> 15 street-side <br /> Height' 132 <br /> FAR2 40% <br /> 1)Height is taken from the lowest finished grade adjacent to the house to the highest point of the <br /> home. <br /> 2) Maximum building area includes primary and Class I accessory structures but excludes up to <br /> 600 square feet of garage area. Portions of garage floor area over 600 square feet shall be <br /> included in the building area calculation. <br /> 3) The southeast corner of the garage on Lot 1 is measured 15 feet to the cul-de-sac of Street"A". <br /> Unless otherwise specified above, the site development standards of the R-1-10,000 <br /> District shall apply. <br /> 9. Appliances meeting Energy Star standards shall be installed as part of the project. <br /> The proposed appliances shall be indicated on the plans submitted for the issuance <br /> of a building permit. <br /> 10. Water conservation devices such as low-flow faucets, toilets, shower fixtures, etc. <br /> shall be installed as part of the project. The devices shall be indicated on the plans <br /> submitted for the issuance of a building permit. <br /> Page 2 of 22 <br />