My WebLink
|
Help
|
About
|
Sign Out
19
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
071613
>
19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 2:34:43 PM
Creation date
7/9/2013 4:38:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2013
DESTRUCT DATE
15Y
DOCUMENT NO
19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
venue for a wide range of outdoor dramatic and musical performances. The size <br /> of the performance area would be approximately 1,000 square feet, and the <br /> stage should extend slightly into the audience area (thrust stage). The <br /> Downtown Specific Plan recommends that the bandstand be located close to <br /> Railroad Avenue. Although its precise location and orientation would depend <br /> upon whether or not the drainage swale was undergrounded, it should also <br /> consider the audience area and provide for ease of access for equipment "load- <br /> in" and for the performers. <br /> • Group Picnic Area: This should be an area with facilities for casual gatherings <br /> and should be located within Delucchi Park near Neal Street. The area should <br /> include small tables, trash receptacles and a drinking fountain, and may include <br /> other amenities, such as a shade arbor. <br /> • Open Pavilion Market: The feasibility of developing an open pavilion market <br /> adjacent to the new restroom building at Delucchi Park should be explored. It <br /> should complement Lions Wayside Park, support the weekly Farmers' Market, <br /> and co-exist with the Regional Trail. <br /> • Regional Trail: It is recommended that a regional trail, suitable for non- <br /> motorized uses (pedestrians, equestrian, bicycles, roller-blades, etc.) should be <br /> incorporated into the park. This trail will eventually travel the length of the <br /> Regional Trail Corridor and connect to other segments of the City's trail system. <br /> • Adventure Play: It is recommended that an "adventure play area" for Lions <br /> Wayside and/or Delucchi Parks be developed. These would be linear areas <br /> appropriate for play for children over six (6) years of age. They should be <br /> designed to be visible from surrounding areas, safe and aesthetically attractive. <br /> They may accommodate free imaginative play and activities such as running, <br /> jumping, climbing, and sliding. <br /> • Other Improvements: A number of other related improvements are <br /> recommended for the parks in order to enhance their function and aesthetics. <br /> These improvements include: signage, lighting, grading and paving, planting and <br /> related improvements. <br /> Mr. Richard Larson will be available to present the key design elements for the Lions <br /> Wayside and Delucchi Parks Master Plan and provide detail regarding the two drainage <br /> swale options. <br /> By: Fiscal Review: Approved y: <br /> / Julie Yua iu Emily Wag er AA4 `' Nelson Fia o <br /> Assistant City Manager/ Director of Finance City Manager <br /> Administrative Services Director <br /> Attachment: <br /> 1. Master Plan Options A and B <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.