My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
071613
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2013 4:29:59 PM
Creation date
7/9/2013 4:29:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2013
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2013 Rate Schedule <br /> Avila and Associates <br /> Consulting Engineers, Inc. <br /> Hourly Charge Rate Schedule <br /> Personnel Charges <br /> Charges for personnel engaged in professional and/or technical work are based on the <br /> actual hours directly chargeable to the project. <br /> Current rates by classification are listed below: <br /> Classification <br /> Project Manager $180 to$200/hour <br /> Project Engineer $155 to $165/hour <br /> Senior Biologist $150 to$160/hour <br /> Senior Engineer $125 to$135/hour <br /> Associate Engineer $112 to $120/hour <br /> Drafting $85/hour <br /> Administration $62.50/hour <br /> Deposition and Testimony <br /> Catherine M.C. Avila, P.E., Principal $ 250.00/hour <br /> Minimum charge per day,4-hours per day <br /> Materials and Services <br /> Subcontractors, mileage-federal rate, special equipment, and outside reproduction,data <br /> processing,computer services, etc.,will be charged at 1.10 times cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.