Impact 4.N-7: Development facilitated by the General Plan Amendment and rezonings could <br /> potentially add traffic to the regional roadway network to the point at which they would operate <br /> unacceptably under cumulative plus project conditions. <br /> Traffic generated by development facilitated under the proposed Housing Element on the <br /> potential sites for rezoning would not worsen any segment projected to operate acceptably to <br /> unacceptable conditions; however, it would increase the volume to capacity ratio (V/C) by <br /> more than 0.03 on two roadway segments projected to operate at LOS F: Sunol Boulevard <br /> (First Street) between Vineyard Avenue and Stanley Boulevard under Year 2015 and 2035 <br /> conditions; and Hopyard Road between Owens Drive and 1-580 under 2035 conditions. Based <br /> on the significance criteria, this is considered a significant impact. Existing development <br /> surrounding these roadways would need to be removed in order to widen them, rendering such <br /> widening infeasible. However, there are improvements that could be made to nearby parallel <br /> corridors which could create more attractive alternative routes and lessen the traffic volumes <br /> on Sunol Boulevard and Hopyard Road. A mitigation measure of the SEIR requires <br /> developers of the potential sites for rezoning to contribute fair-share funds through the <br /> payment of the City of Pleasanton and Tri-Valley Regional traffic impact fees to help fund <br /> future improvements to local and regional roadways. However, because the City cannot be <br /> assured that the collected regional funds would be spent to specifically improve the nearby <br /> parallel corridors as the regional funds are used by the regional agency, the traffic impact <br /> remained significant and unavoidable. Staff notes that the traffic impacts of the nine sites <br /> ultimately selected would be considerably less than the traffic impacts analyzed in the SEIR. <br /> VI. CONCLUSION <br /> Staff believes that the proposed draft Development Agreement is consistent with the General <br /> Plan and meets the requirements of State Planning and Zoning law. The draft Development <br /> Agreement provides the developer with certainty regarding project entitlements and provides <br /> the City with an agreement regarding the developer's obligation to pay certain development <br /> fees, school fees, and provide below market-rate housing units. <br /> VII. STAFF RECOMMENDATION <br /> Staff recommends that the Planning Commission take the following actions: <br /> 1. Find that the conditions described in CEQA Guidelines Section 15162 have not <br /> occurred as described in the Addendum to the SEIR and find that the previously <br /> prepared SEIR, including the adopted CEQA Findings and Statement of Overriding <br /> Considerations, and the Addendum to the SEIR are adequate to serve as the <br /> environmental documentation for this project and satisfy all the requirements of <br /> CEQA; <br /> 2. Find that the proposed Development Agreement is consistent with the General Plan; <br /> a Adopt a resolution recommending approval of Case P13-1944, a draft Development <br /> Agreement, as set forth in Exhibit A. <br /> Staff Planner Janice Stern, Planning Manager 925.931.5606/jstemCUJcit vofpleasantonca.aov <br /> P13-1944, Development Agreement June 12, 2013 <br /> Page 5 of 5 <br />