Laserfiche WebLink
fallen debris or splatters that could contribute to storm water runoff <br />pollution. <br /> <br />bo <br /> <br />Remove all dirt, gravel, rubbish, refuse, and green waste from the <br />street pavement and storm drains adjoining the site. Limit <br />construction access routes onto the site and place gravel on them. <br />Do not drive vehicles and equipment off paved or ~aveied areas <br />during wet weather. Broom sweep the street pavement adjoining the <br />project site on a daily basis. Scrape caked-on mud and dirt from <br />these areas before sweeping. <br /> <br />Co <br /> <br />Install filter materials (such as sandbags, filter fabric, etc.) at the <br />storm drain inlet nearest the downstream side of the project site in <br />order to retain any debris or dirt flowing in the storm drain system. <br />Maintain and/or replace filter materials to ensure effectiveness and <br />to prevent street flooding. <br /> <br />do <br /> <br />Create a contained and covered area on the site for the storage of <br />bags, cement, paints, oils, fertilizers, pesticides, or other materials <br />used on the site that have the potential of being discharged into the <br />storm drain system through being windblown or in the event of a <br />material spill. <br /> <br />eo <br /> <br />Never clean machinery., equipment, tools, brushes, or rinse <br />containers into astreet, gutter, or storm drain. Ensure that <br />concrete/gunite supply trucks or concrete/plaster operations do not <br />discharge wash water into street.' gutters, or storm drains. <br /> <br />64. Prior to submittal of the subdivision map, the developer shall submit a <br /> landscape plan for review and approval by the Planning Director indicating the <br /> planting of a minimum of twelve (12) 15-gallon size evergreen shrubs 10 ft. on <br /> center on Lot 4 along the property line in common with 993 Summit Creek <br /> Court. Within 60 days of the completion of mass wading for the project, the <br /> developer shall plant these shrubs and shall maintain them in good health until <br /> the installation of the irrigation system for Lot 4 is completed, at which time <br /> the owner of Lot 4 will then be responsible to maintain them. The design <br /> guidelines shall be modified to indicate that the landscape plan submitted with <br /> the design review application for the custom home on Lot 4 shall identify these <br /> shrubs as plants to remain and to state that the owner of Lot 4 shall maintain <br /> these shrubs in good health and at a height that helps to screen the view of the <br /> house on Lot 4 as seen from the.existing house located at 993 Summit Creek <br /> Court. <br /> <br /> <br />