My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
061813
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2013 4:33:55 PM
Creation date
6/12/2013 4:33:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2013
DESTRUCT DATE
15Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION <br /> Beginning in 2012, the Metropolitan Transportation Commission (MTC) began a <br /> coordinated call for projects called the One Bay Area Grant Program, which consists of <br /> two Federal Grant Programs: Surface Transportation Program (STP) and Congestion <br /> Management Air Quality (CMAQ). <br /> The One Bay Area Grant Program allocates Federal STP and CMAQ funds for the next <br /> four fiscal years (Fiscal Year 2012-2013 through Fiscal Year 2015-2016). The program <br /> supports California's climate law, SB 375, which requires a Sustainable Communities <br /> Strategy to integrate land use and transportation to reduce greenhouse gas emissions. <br /> Alameda CTC is programming approximately $15.2 million of One I3ay Area Grant <br /> funds for eligible Local Street and Roads (LSR) projects such as pavement <br /> rehabilitation within Alameda County. Pleasanton's share of the OBAG-LSR funds is <br /> $832,000. There is a minimum local funding match requirement of ' 1.47% which is <br /> $108,000. <br /> The City has identified Valley Avenue and Hopyard Road as a pavement rehabilitation <br /> project eligible for OBAG-LSR funds. The proposed project will remove and replace <br /> failed pavement areas, resurface the pavement with asphalt concrete, and reinstall <br /> pavement striping. This project will be included in the FY 2013-14 Annual Street Overlay <br /> Program as shown in the Capital Improvement Program. <br /> In order for the OBAG-LSR funds to be programmed, the City is requested to adopt a <br /> resolution authorizing an application for funding assigned to MTC, committing any <br /> necessary funds, and stating assurance to complete the Project. <br /> Submitte by: Fiscal Review: Approved by: <br /> (ce7-k; <br /> Brian Dolan Emily Wagner Nelhon Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Resolution <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.