Laserfiche WebLink
measures, shall be included in the SWPPP and implemented as approved by the <br /> City. <br /> i. The project developer shall include erosion control/stormwater quality <br /> measures on the project grading plan which shall specifically address <br /> measures to prevent soil, dirt, and debris from entering the public storm <br /> drain system. Such measures may include, but are not limited to, <br /> hydroseeding, hay bales, sandbags, and siltation fences and shall be <br /> subject to the review and approval of the City Engineer/Chief Building <br /> Official. If no grading plan is required, necessary erosion <br /> control/stormwater quality measures shall be shown on the site plan <br /> submitted for a building permit, and shall be subject to the review and <br /> approval of the Building and Safety Division. The project developer is <br /> responsible for ensuring that the contractor is aware of and implements <br /> such measures. <br /> ii. All cut and fill slopes shall be revegetated and stabilized after <br /> completion of grading, but in no case later than October 15. Hydroseeding <br /> shall be accomplished before September 15 and irrigated with a <br /> temporary irrigation system to ensure that the vegetated areas are <br /> established before October 15. No grading shall occur between October <br /> 15 and April 15 unless approved erosion control/stormwater quality <br /> measures are in place, subject to the approval of City Engineer/Chief <br /> Building Official. Such measures shall be maintained until such time as <br /> permanent landscaping is place. <br /> iii. Gather all sorted construction debris on a regular basis and place them <br /> in the appropriate container for recycling to be emptied at least on a <br /> weekly basis. When appropriate, use tarps on the ground to collect fallen <br /> debris or splatters that could contribute to stormwater runoff pollution. <br /> iv. Remove all dirt, gravel, rubbish, refuse, and green waste from the <br /> street pavement and storm drains adjoining the site. Limit construction <br /> access routes onto the site and place gravel on them. Do not drive <br /> vehicles and equipment off paved or graveled areas during wet weather. <br /> Broom sweep the street pavement adjoining the project site on a daily <br /> basis. Scrape caked on mud and dirt from these areas before sweeping. <br /> v. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to retain <br /> any debris or dirt flowing in the storm drain system. Maintain and/or <br /> PUD-81-30-87D, Anton Hacienda Apartments May 21, 2013 <br /> Page 30 of 33 <br />