My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
061813
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2013 4:31:08 PM
Creation date
6/12/2013 4:30:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
106. The project developer shall submit detailed landscape and irrigation plans as part of <br /> the building permit plans. The irrigation plan shall provide for automatic controls. <br /> 107. The building permit plans for this development shall contain signage and striping <br /> plans that are subject to the approval of the City Traffic Engineer. <br /> 108. All dry utilities (electric power distribution, gas distribution, communication service, <br /> Cable television, street lights and any required alarm systems) required to serve <br /> existing or new development shall be installed in conduit, underground in a joint <br /> utility trench unless otherwise specifically approved by the City Engineer. <br /> 109. The project developer shall arrange and pay for the geotechnical consultant to <br /> inspect and approve all foundation, retaining, and wall and drainage geotechnical <br /> aspects of project construction. The consultant shall be present on site during <br /> grading and excavation operations. The results of the inspections and the as-built <br /> conditions of the project shall be certified in writing by the geotechnical consultant <br /> for conformance to the approved plans and geotechnical report and submitted to <br /> the City Engineer for review and approval prior to occupancy. <br /> 110. The encroachment permit for haul route for all materials and equipment to and from <br /> this development shall be approved by the City Engineer prior to the issuance of <br /> any permit by City Building Division or Engineering Division. <br /> 111. Any damage to existing street improvements during construction on the subject <br /> property shall be repaired to the satisfaction of the City Engineer at full expense to <br /> the project developer. This shall include slurry seal, overlay, or street reconstruction <br /> if deemed warranted by the City Engineer. <br /> Fire Department <br /> 112. All multi-family residential occupancies shall have valve tamper and water flow <br /> connected to an Underwriters Laboratory (UL) listed Central Station Service. Fire <br /> Department plan check includes specifications, monitoring certificate(s), installation <br /> certificate and alarm company UL certificate. <br /> 113. Fire alarm control panel and remote annunciation shall be at location(s) approved <br /> by the Fire Prevention Bureau. All systems shall be point identified by individual <br /> device and annunciated by device type and point. <br /> 114. The project developer shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection. <br /> PUD-81-30-87D, Anton Hacienda Apartments May 21, 2013 <br /> Page 20 of 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.