Laserfiche WebLink
Prior to the installation, the applicant/developer shall submit the design and location <br /> of the bicycle racks to the Director of Community Development for review and <br /> approval. <br /> Building and Safety Division <br /> 93.AII retaining walls higher than four feet from the top of the wall to the bottom of the <br /> footway shall be constructed of reinforced concrete, masonry, or other material as <br /> approved by the Director of Community Development, or shall be an approved crib <br /> wall type. Calculations signed by a registered civil engineer shall accompany the <br /> wall plans. <br /> 94.At the time of building permit plan submittal, the project developer shall submit a <br /> final grading and drainage plan prepared by a licensed civil engineer depicting all <br /> final grades and on-site drainage control measures to prevent stormwater runoff <br /> onto adjoining properties. <br /> 95.Prior to issuance of building permits, the applicant/developer shall submit a waste <br /> management plan to the Building and Safety Division. The plan shall include the <br /> estimated composition and quantities of waste to be generated and how the project <br /> developer intends to recycle at least 75 percent of the total job site construction <br /> waste measured by weight or volume. Proof of compliance shall be provided to the <br /> Chief Building Official prior to the issuance of a final building permit. During <br /> construction, the project developer shall mark all trash disposal bins "trash <br /> materials only" and all recycling bins "recycling materials only." The project <br /> developer shall contact Pleasanton Garbage Service for the disposal of all waste <br /> from the site. <br /> Engineering Division <br /> 96.A "Conditions of Approval" checklist shall be completed and attached to all plan <br /> checks submitted for approval indicating that all conditions have been satisfied. <br /> 97.The project developer shall grant an easement to the City over those portions of the <br /> parcel needed for public service easements (P.S.E.) and which are approved by the <br /> City Engineer, or other easements, which may be designated by the City Engineer. <br /> 98. The project developer shall comply with the recommendations of the project's <br /> geotechnical consultant. The project developer's geotechnical consultant shall <br /> review and approve all foundation, retaining wall, and drainage geotechnical <br /> aspects of the final development plans to ensure that the recommendations have <br /> been properly incorporated into the project design. The consultant shall certify by <br /> writing on the plans or as otherwise acceptable to the City Engineer that the final <br /> PUD-81-30-87D, Anton Hacienda Apartments May 21, 2013 <br /> Page 18 of 33 <br />