Laserfiche WebLink
Preventative Maintenance Schedule <br /> The City requires that the Contractor will perform preventative maintenance on all signal equipment. <br /> A traffic signal includes,but is not limited to:traffic signal controller and cabinet and all appurtenant <br /> equipment, service cabinet, flashing beacons related to traffic signal operations (i.e. advanced <br /> warning beacons),pedestrian and vehicle signals,detector systems,video detection camera systems, <br /> CCTV camera systems, wireless vehicle detection system, interconnect cable (copper and fiber <br /> optic), wireless communications equipment, traffic signal communications equipment, emergency <br /> vehicle preemption system, uninterrupted power supply system, intersection safety lighting, <br /> internally illuminated street name signs, and radar speed signs related to traffic signal operations. <br /> The Contractor shall use a Windows-based computerized maintenance and inventory management <br /> system to record all work done as outlined in the Scope of Work. The Preventative Maintenance <br /> database shall be continually updated. The City shall have access to the database via the internet as <br /> well as an updated hard copy of the database that shall be furnished to the City en a monthly basis. <br /> All records shall be updated in real time by the contractor via PDA or similar device. <br /> Upon completion of each Preventative Maintenance inspection detailed in this schedule, the <br /> contractor shall supply a computerized report to the City Traffic Engineering Division itemizing each <br /> check performed and the result of that check. A separate report shall be generated for the monthly, <br /> quarterly, and annual, even when all of these checks occur in the same month. <br /> The Contractor shall also provide a computerized monthly report to the City Traffic Engineering <br /> Division of the Community Development Department by the fifteenth day of each month that <br /> summarizes the pending repair work needed at each intersection. This report shall be broken down <br /> by intersection and be separate from the Preventative Maintenance Report.This may be provided by <br /> hard copy or by email on the 15th day of each month. <br /> The contractor shall perform the following Monthly Preventative Maintenance inspections and <br /> corrective work every month. <br /> 1. Controller Cabinet <br /> • Test and Check ground fault receptacle <br /> • Observe the general appearance of the cabinet, noting any rust or other signs of <br /> deterioration and complete/recommend repair work if needed <br /> • Inspect door gasket condition and replace if necessary <br /> • Inspect door lock operation and replace if necessary <br /> • Operate and inspect ventilation fan and cabinet light (where applicable) <br /> • Inspect for pests in cabinet and take corrective action if needed <br /> • Visually inspect all relays, photocells, cabinet locks, cabinet fans, switches and make <br /> routine adjustments and repairs as necessary <br /> Traffic Signal Maintenance Contract Contract No. <br /> Attachment 4—Preventative Maintenance Schedule Page 1 <br />